Key Facts

Trigger
10+ required parking spaces
Rate (post 1/1/2022)
20% of spaces EVSE-ready
Rate (pre 1/1/2022)
10% of spaces EVSE-ready
Scope
Unincorporated Miami-Dade (UMSA) only
Exempt uses
Single-family, duplex, townhouse, church CU

Summary

New multifamily buildings in unincorporated Miami-Dade County (UMSA) with 10 or more required parking spaces must wire at least 20 percent of those spaces as EV-ready, for projects permitted on or after January 1, 2022.

City-specific rules exist: Miami, Coral Gables, Hialeah, Homestead, Miami Beach, and Doral have their own ev charging rules that differ from Miami-Dade County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

Parking spaces specifically designed for charging of Electric Vehicles shall be required in accordance with the following provisions for all new uses other than single-family, duplex, or townhouse, and properties with a current CU and occupancy for a church or religious use...EVSE-Ready Space shall mean a parking space with full circuity installed in accordance with the Florida Building Code and ready for the charger to be connected.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 135).

Full Breakdown

Miami-Dade's zoning code requires EVSE parking spaces for all new uses other than single-family, duplex or townhouse construction (and certain church properties), including multifamily apartment developments. Projects with fewer than 10 required off-street parking spaces owe none; those with 10 or more must make 20 percent EVSE-ready (10 percent for projects permitted before January 1, 2022), rounded up, with a minimum of one space. EVSE-ready means full circuitry installed to Florida Building Code standard, ready for a charger hookup. Each charging space needs a permanent posted sign meeting the county's standard EV charging design, and operators may set posted fees and time limits. This rule reaches unincorporated Miami-Dade (UMSA) only, it does not bind Miami, Hialeah, Miami Beach or the other 33 municipalities.

Violations & Fines

Countywide, occupying or blocking a marked EVSE space without connecting to the charger is a noncriminal traffic infraction under Sec. 30-16: the vehicle can be relocated or towed at the owner's cost, and the violator faces the maximum fine set for a non-moving violation under Chapter 318, Florida Statutes.

Frequently Asked Questions

Does this rule apply inside Miami, Hialeah or Miami Beach?
No. Section 33-122.5 is part of the county Zoning Code, which governs unincorporated Miami-Dade (UMSA) only; each of the 34 cities sets its own EV parking standards.
How many EV-ready spaces does a new apartment complex need?
None if it has under 10 total required parking spaces. At 10 or more, 20 percent must be EVSE-ready (rounded up, minimum one), for developments permitted on or after January 1, 2022.
Can I park a gas car in a marked EV charging space?
No. Countywide under Section 30-16, occupying or blocking a marked EVSE space without connecting to the charger is a noncriminal traffic infraction, enforceable by relocation, towing, and a fine.

Sources & Official References

Other rules in Miami-Dade County

All Miami-Dade County rules

Florida rules heatmap·Compare Miami-Dade County to another location·View the Florida parking rules overview

Get notified when EV Charging in Miami-Dade County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Cities Across Miami-Dade County