Chandler, AZ Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Governing section
- City Code § 46-2
- Permit needed for
- Any right-of-way work or placement
- Application requires
- Site plans plus non-refundable fee
- Work must start within
- 180 days of issuance
- Construction permit term cap
- 1 year
- Valet zones
- Separate permit required per zone
- Civil infraction range
- $300–$2,500 per day
Summary
Anyone who wants to place a structure, sign, furniture or fixture in a Chandler street, sidewalk or other public right-of-way needs an encroachment permit under City Code § 46-2 before doing the work. The requirement covers excavation, utility lines, booths, counters and valet parking zones, and the City sorts each application into the permit class that fits the use.
46-2. - Encroachment permit required. A. No person shall encroach nor place any encroachment upon, over or under the surface of any public place, highway, right-of-way, pathway, street, sidewalk, driveway, curb, gutter, paving or other surface or subsurface drainage structure or facility for any purpose whatsoever, without first obtaining a permit from the City in accordance with the provisions set forth herein. C. No person shall erect, place, display, maintain or use any obstruction, booth, stand, counter, furniture, sign, flag or temporary or permanent fixture upon any public place, highway, street, sidewalk, alley or other public right-of-way, for any purpose whatsoever, without first obtaining a permit from the City in accordance with the provisions set forth herein. E. No person shall provide valet parking using a public street or public place for a valet parking zone, for locating a valet parking station, for storing patrons' vehicles, or for traveling without first obtaining a permit in accordance with the provisions set forth herein.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 79).
Full Breakdown
City Code § 46-2 sets the baseline rule for every private use of a Chandler right-of-way: subsection A bars encroaching on 'any public place, highway, right-of-way, pathway, street, sidewalk, driveway, curb, gutter, paving or other surface or subsurface drainage structure or facility for any purpose whatsoever, without first obtaining a permit,' subsection B extends that to excavating or installing pipes, conduit, wire or cable, and subsection C separately bars placing 'any obstruction, booth, stand, counter, furniture, sign, flag or temporary or permanent fixture' in the right-of-way without a permit.
Subsection E adds a dedicated permit for valet parking zones, with a separate permit required for each zone and no priority claim to City-owned parking, which is filled first-come-first-served. 1 carves out narrow exceptions. City traffic-control markings, utility locate marks, true emergencies (with an application due within one calendar day after City offices reopen), and temporary signs under Chapter 39. 4 lets the Department combine multiple permit types into one encroachment permit while still requiring a separate license or franchise for each activity. 6 lays out the terms attached to every permit: an indemnification agreement satisfying the City Attorney, insurance in Risk-Manager-set minimums, an optional performance bond, work that must start within 180 days of issuance or the permit lapses, and a maximum one-year term for construction work (continuing-use permits get their own specified period). Permits are not assignable without the Department's prior written consent.
Violations & Fines
Unpermitted right-of-way use is enforced under § 46-1.8's civil-infraction schedule, which sets specific daily amounts: $1,800 for failing to correct a safety hazard within 24 hours of notice, $1,200 for occupying the right-of-way more than 30 minutes without a City traffic-barricade certification or approved traffic-control plan, and $600-to-$300 tiers for missing warning signs, barricades or ADA-blocking closures; the chapter's general catch-all runs $300 to $2,500 per day with a non-waivable $300 floor, and each day of violation counts separately.
Frequently Asked Questions
What counts as an 'encroachment' under Chandler's right-of-way code?
Is there ever an exception to needing a permit?
How long is an encroachment permit good for?
Do I need a separate permit for each valet parking zone?
Sources & Official References
Other rules in Chandler
Compare Chandler to another location·View the Arizona sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Encroachment Permits in Nearby Cities
How other cities in Maricopa County handle encroachment permits.