Key Facts

Permit required for
obstructing or excavating right-of-way
Review timeline
3 business days (§ 10-211)
Unpermitted work penalty
double all fees (§ 10-221)
Sidewalk excavation bridge
at least 4 feet wide
Appeal path
written appeal to City Council
Administering office
Public Works Director

Summary

In the City of Coon Rapids, no one may obstruct or excavate any public right-of-way, including boulevards and sidewalks, without first obtaining a Right-of-Way Permit under City Code § 10-209. Public Works must act on an application within three business days per § 10-211, and working without a permit doubles every fee owed under § 10-221.

(18)"Obstruct" means to place any tangible object in a Right-of-Way so as to hinder free and open passage over that or any part of the Right-of-Way. ... (1)Permit Required. Except as otherwise provided in this Code, no Person may obstruct or excavate any Right-of-Way without first having obtained the appropriate Right-of-Way Permit from the City to do so.(a)Right-of-Way Permit. Right-of-Way Permit is required to allow the holder to excavate that part of the Right-of-Way described in such Permit and/or to hinder free and open passage over the specified portion of the traveled surface within the Right-of-Way limits by placing facilities described therein to the extent and for the duration specified therein.

Full Breakdown

Chapter 10-200 of the Coon Rapids City Code, "Right-of-Way Management," governs any private use of the public right-of-way, defined broadly to include roadways, sidewalks, boulevards, and utility easements the City holds an interest in. Section 10-202(18) defines "obstruct" as placing any tangible object in the right-of-way so as to hinder free and open passage over any part of it, and § 10-209(1) makes it unlawful for any person, not just utilities, to obstruct or excavate a right-of-way without first obtaining the appropriate Right-of-Way Permit from the City.

The permit covers excavation, placing facilities or obstructions on the right-of-way, and installing above-ground structures, and it must state whether any obstruction of the traveled surface will last more than four hours. Applications go to the City under § 10-210 and must include a scaled drawing of the project area, payment of fees, and, when facilities already exist, a construction performance bond. Under § 10-211(1), the City must issue the permit or give written reasons for denial within three business days of a complete application.

Working without a permit is not simply unlawful: § 10-221(2) requires anyone caught obstructing or excavating without one to still obtain a permit afterward, but at double the normal fee and double every other City Code fee, including fines and penalties, plus the cost of repairing any right-of-way damage. Section 10-217(7) requires that any sidewalk excavation include a foot bridge at least four feet wide with secure railing so pedestrians can keep passing safely. A denied, revoked, or fee-disputed permit can be appealed in writing to the City Council under § 10-224, with binding arbitration or District Court available if the Council affirms the denial. The Public Works Director administers the chapter.

Violations & Fines

Obstructing or excavating a Coon Rapids right-of-way without a permit does not excuse the work retroactively: § 10-221(2) requires the responsible person to still obtain a permit afterward at double the normal permit fee, plus double every other City Code fee, including any fines, and to cover the cost of repairing right-of-way damage. The City may also revoke an existing permit for a substantial breach under § 10-223, forfeiting the fee already paid.

Frequently Asked Questions

Do I need a permit to dig in the boulevard in front of my Coon Rapids house?
Yes if the work obstructs or excavates the right-of-way. Section 10-209(1) requires a Right-of-Way Permit from the City for excavation or for placing facilities or obstructions in the right-of-way, which includes the boulevard between the curb and property line, not just the paved street.
How long does the City take to decide on a right-of-way permit application?
Section 10-211(1) gives the City three business days after receiving a complete application to either issue the permit or provide written reasons for denial. Applications must include a scaled drawing of the project area and payment of applicable fees before that clock starts running.
What happens if I excavate the right-of-way without getting a permit first?
Section 10-221(2) still requires you to obtain a permit afterward, but at double the normal fee, plus double any other City Code fee, including fines and penalties, and you must cover the cost of repairing any damage the unpermitted work caused to the right-of-way.

Sources & Official References

Other rules in Coon Rapids

All Coon Rapids rules

Compare Coon Rapids to another location·View the Minnesota sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Coon Rapids, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.