Key Facts

Permit required
Building Permit, all systems
Application requires
Scaled elevation drawings
Community-scale threshold
20+ acres
Building-integrated systems
Exempt from this section
Abandoned system removal
Within 180 days

Summary

Every solar energy system in Coon Rapids, whether roof- or ground-mounted, needs a building permit under § 11-1602.4, and the application must include scaled drawings showing the system's placement, structures, property lines, and setbacks, with extra site-plan detail required for large community-scale arrays.

11-1602.4Permitting Process.(1)All Solar Energy Systems require a Building Permit. In addition to the general application information required as part of the Building Permit, the applicant must submit the following:(a)Scaled Horizontal and Vertical (elevation) Drawings: The drawings must show the location of the system on the building, or on the property for a ground-mounted system, including all structures, property lines, easements, power lines and setbacks to property lines.( ... b)Pitched roof-mounted Systems: For all roof-mounted systems, other than a flat roof, the elevation drawings shall show the highest finished slope of the solar collector and the slope of the finished roof surface on which it is mounted.(c)Flat-roof-mounted Systems: For flat-roof applications a drawing shall be submitted showing the distance to the roof edge and any parapets on the building and shall identify the height of the building on the street frontage side, the shortest distance of the system from the street frontage edge of the building, and the highest finished height of the solar collector above the finished surface of the roof.

Full Breakdown

Section 11-1602.4(1) requires all Solar Energy Systems to obtain a Building Permit, on top of which the applicant must submit scaled horizontal and vertical elevation drawings showing the system's location on the building or, for a ground-mounted system, on the property, including all structures, property lines, easements, power lines, and setbacks. Community-Scale Solar Energy Systems, defined at § 11-1602.2(2) as ground-mounted arrays on 20 or more acres serving on-site or off-site electric demand, require a more detailed site plan covering solar arrays, other structures, property lines, rights-of-way, service roads, floodplains, wetlands, other protected natural resources, topography, electric equipment, and all zoning and overlay districts.

For a pitched roof-mounted system other than a flat roof, the elevation drawings must show the highest finished slope of the collector against the finished roof slope; for a flat roof, the drawing must show the distance to the roof edge and any parapets, the building's height on the street frontage side, the shortest distance of the system from that frontage edge, and the system's highest finished height above the roof surface. Passive or building-integrated systems, meaning panels built into roofing, windows, skylights, or awnings rather than added as a separate device, are exempt from this section's permitting and performance standards and are instead regulated like any other building component under § 11-1602.3.

Neighborhood-scale ground-mounted systems must also meet the front setback for their district and sit at least five feet from side, side-street, and rear lot lines under § 11-1602.5(1), and may not exceed 15 feet in height in residential districts under § 11-1602.5(2).

Violations & Fines

Installing a solar energy system without the required building permit and supporting drawings under § 11-1602.4, or failing to meet the applicable setback or height standards in § 11-1602.5 or § 11-1602.6, is a Chapter 11 zoning violation; an abandoned or unused system not removed within 180 days of ceasing operation is processed as a violation through the administrative procedures of Chapter 2-1100 under § 11-1602.7.

Frequently Asked Questions

Do I need a permit to install rooftop solar panels in Coon Rapids?
Yes. Section 11-1602.4(1) requires a Building Permit for all Solar Energy Systems, along with scaled elevation drawings showing the panels' location, structures, property lines, and setbacks, before installation.
Is a solar shingle or skylight system treated differently?
Yes. Building-integrated systems, panels built into roofing, windows, skylights, or awnings rather than a separate mounted device, are exempt from § 11-1602's permitting and performance standards and are regulated like any other building component under § 11-1602.3.
What extra paperwork applies to a large community solar array?
Community-Scale Solar Energy Systems on 20 or more acres need a detailed site plan under § 11-1602.4(1)(a)(i) covering the arrays, structures, rights-of-way, floodplains, wetlands, topography, and all applicable zoning and overlay districts, beyond the basic elevation drawings required of smaller systems.

Sources & Official References

Other rules in Coon Rapids

All Coon Rapids rules

Compare Coon Rapids to another location·View the Minnesota solar energy overview

Get notified when Panel Permits in Coon Rapids, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.