Skip to main content
CityRuleLookup

Littleton, CO Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

License required
D20 Solar PV contractor or owner-permit
Permit duty
Obtain permit before any on-site work
Height exception
Solar arrays exempt from district height limit
Setback exception
Solar devices allowed inside required yard setbacks
Penalty
Up to $2,650 fine, up to 364 days jail
Permit fees
Set by City Council resolution, section 4-1-7

Summary

Installing solar photovoltaic panels in the City of Littleton requires a building permit and a licensed D20 Solar PV contractor under the city's contractor licensing chapter. The zoning code exempts rooftop and ground solar arrays from the district's maximum height limit and lets them sit inside required yard setbacks, so a properly designed system rarely needs a variance.

s. D20. Solar PV. The installation, alteration, and addition of solar photoelectric panels. ... 2. To obtain permits prior to any work being performed on-site; ... A. Performing work which requires a license or registration certificate, without having such a license or registration certificate, is hereby declared to be a criminal offense subject to the general penalty provisions under Section 1-4-1 of this Code. No building permit(s) shall be issued until a proper license(s) or registration certificate(s) is presented to the Division for the work to be done. ... Section 10-1-2.3 Height and Yard Exceptions ... B. Exceptions. ... 1. Height. The following appurtenances may exceed the prescribed district height limits provided the additional height is normally required for the proposed use; ... c. Solar array, collector, condenser, cooling tower, flue, stack, heat storage unit, or necessary mechanical equipment required for building functionality; ... C. Yard Exceptions. The space in a required front, side, or rear yard shall be open and unobstructed with the following exceptions: ... 11. Attached or detached solar energy devices;

Full Breakdown

Littleton's contractor licensing chapter, Title 3 Chapter 16, creates a dedicated 'D20. Solar PV' license class covering the installation, alteration, and addition of solar photoelectric panels (Code section 3-16-4(A)(4)(s)). Anyone contracting for that work in the City of Littleton must hold the D20 license or registration certificate from the Building Inspection Division before applying for a permit, and every license holder is required to obtain permits prior to any work being performed on-site under section 3-16-5(A)(2). The Division will not issue the building permit itself until the D20 license or certificate is on file, and any permit already issued is suspended if the license lapses under section 3-16-10(A).

Once permitted, the zoning code gives solar installations real dimensional relief that most accessory equipment does not get. 3(C)(11) lists attached or detached solar energy devices among the fixtures allowed to sit inside a required front, side, or rear yard setback that would otherwise have to stay clear. Fees for the building permit itself are set by City Council resolution under section 4-1-7 rather than fixed in the Code, so the exact dollar amount is confirmed at application. Homeowners performing their own work as the property owner remain subject to the same permit requirements as a licensed contractor, per section 3-16-3.

Violations & Fines

Performing solar installation work without holding the D20 license or registration certificate is a criminal offense under the Code's general penalty, section 1-4-1: a fine of up to $2,650, up to 364 days in jail, or both, with every day of continued violation a separate offense under section 3-16-10(A). The Building Inspection Division will not issue a permit without proof of licensure and will suspend any permit already issued if the contractor's license lapses.

Frequently Asked Questions

Do I need a permit to install solar panels in Littleton?
Yes. Solar photovoltaic installation is a licensed trade under Littleton's contractor code, D20 Solar PV (Code section 3-16-4(A)(4)(s)), and every license holder must obtain a building permit before starting work under section 3-16-5(A)(2). The Building Inspection Division will not issue the permit without a valid D20 license or registration certificate on file, whether the installer is a contractor or the property owner performing the work directly.
Can solar panels exceed my zoning district's height limit?
Yes, within limits. Section 10-1-2.3(B)(1)(c) lists solar arrays and collectors among the equipment exempt from the district's maximum building height, provided the added height is normally required for the equipment to function. That exemption applies to the panel and mounting equipment itself, not to unrelated construction on the same roof.
Can I put solar panels inside my required setback?
Ground-mounted and wall-mounted solar devices are named in the Code's yard exceptions list, section 10-1-2.3(C)(11), so attached or detached solar energy devices may sit within a required front, side, or rear setback that otherwise must stay open and unobstructed. Other equipment on the same property still has to meet the standard setback unless it qualifies for its own listed exception.
What happens if my solar contractor isn't licensed?
Working without the required D20 license is a criminal offense under the Code's general penalty, punishable by a fine of up to $2,650 and up to 364 days in jail, and the city will suspend any building permit issued for the job under section 3-16-10(A). Verify a contractor's license with the Building Inspection Division before signing a contract.

Sources & Official References

Other rules in Littleton

All Littleton rules

Compare Littleton to another location·View the Colorado solar energy overview

Get notified when Panel Permits in Littleton, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Arapahoe County handle panel permits.

Aurora, CO
Some Restrictions
Centennial, CO
Some Restrictions