Key Facts
- Where allowed
- Any zoning district, as accessory use
- Permit needed
- Building permit; no site plan required
- Setback/buffer
- EV stations exempt from both
- Design standard
- Must follow NFPA and NESC clearances
- Penalty
- Up to $2,650 fine (Sec 1-4-1)
Summary
Littleton allows electric vehicle charging as an accessory use in any zoning district without a site plan, but a building permit is required before installing a station. EV charging stations and their utility equipment are exempt from ordinary setback and bufferyard requirements under the Unified Land Use Code.
9. EV Charging, Accessory Use. a. Where Permitted. Electric vehicle charging as an accessory use shall be allowed in any zone district. b. Building Permit Required. It shall be unlawful for any person to install, operate, or maintain one or more EV charging stations without obtaining a building permit. No other site plan or land use permit is required when EV charging is proposed as a standalone addition to an existing site. c. Electric vehicle charging, accessory use shall be subject to the following: 1. The design of EV charging stations shall ensure unobstructed safety and access clearances for EV charging electrical utility equipment, per the National Fire Protection Association (NFPA) standards and National Electric Safety Code (NESC), including features such as landscaping or fences. 2. EV charging stations and EV charging electrical utility equipment shall be exempt from the following: i. Setback requirements; and ii. Bufferyard requirements.
Full Breakdown
A(D)(9) of the Unified Land Use Code governs EV charging as an accessory use, meaning charging equipment added to a site that already has a principal use. The section allows electric vehicle charging as an accessory use in any zone district, so no rezoning or conditional use approval is needed based on district alone. It is unlawful to install, operate, or maintain an EV charging station without first obtaining a building permit, though the code specifically does not require a separate site plan or land use permit when the charging equipment is added as a standalone addition to an existing site.
Design-wise, EV charging stations and their electrical utility equipment must maintain unobstructed safety and access clearances under National Fire Protection Association and National Electric Safety Code standards, which can include landscaping or fencing around the equipment. To make retrofits easier, the code exempts EV charging stations and utility equipment from the district's ordinary setback and bufferyard requirements. Where charging is added to an existing site, the underlying zoning district's screening and principal-use requirements must still be maintained to the degree they are currently met, and no additional site conformance improvements are required as long as the project does not change the existing configuration of lots and structures. F, governs EV charging as a principal, stand-alone use, such as a public fast-charging lot.
Violations & Fines
Installing or operating an EV charging station without the required building permit violates Section 10-1-1.6.A(D)(9) and is punishable under the city's general penalty, Code Section 1-4-1(A): a fine of up to $2,650, up to 364 days in jail, or both, with each day the unpermitted installation remains a separate offense.
Frequently Asked Questions
Do I need a permit to install an EV charger at my Littleton business?
Can an EV charging station be placed inside the normal setback in Littleton?
Is an EV charging station allowed in every Littleton zoning district?
Sources & Official References
Other rules in Littleton
Compare Littleton to another location·View the Colorado parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
EV Charging in Nearby Cities
How other cities in Arapahoe County handle ev charging.