Shoreline, WA Special Events & Permits: Street Fair Rules (2026)
Key Facts
- Permit type
- Right-of-way use permit, Ch. 12.15 SMC
- Covered activity
- Fairs, carnivals, assemblies (§ 12.15.030(D)(1)(m))
- Application lead time
- 10+ working days before the event
- Maximum duration
- Up to 180 days
- Sign removal deadline
- Within 24 hours after event ends
- Issuing department
- Public Works and Utilities Department
Summary
A street fair, festival or other large gathering that uses a Shoreline street needs a right-of-way use permit under SMC § 12.15.030(D), which lists "assemblies, fairs, carnivals, shows, exhibitions, or large gatherings of people" among the covered activities. Organizers apply to the Public Works and Utilities Department at least 10 working days ahead, pay a fee, and can hold the right-of-way for up to 180 days.
All use of the right-of-way shall be for a lawful purpose and shall not breach the peace or adversely interfere with public use of the right-of-way. ... ... 1. Right-of-way use permits may be issued for the following activities: ... ... m. Assemblies, fairs, carnivals, shows, exhibitions, or large gatherings of people that may use or obstruct the right-of-way with people, vehicles, and signs and may produce noise; ... ... 3. Right-of-way use permits may extend up to 180 days, provided permits issued for the following uses may exceed 180 days:
Full Breakdown
Chapter 12.15 SMC treats a fair or festival that occupies streets or sidewalks as a right-of-way use, not a private encroachment, and the permit exists so the event does not unreasonably obstruct vehicular and pedestrian travel. Applicants file with the department under § 12.15.040 and must include a scale drawing of the closure, a description of the use, its planned duration, contact information and a traffic and pedestrian control plan if circulation will be disrupted; the director can add conditions to protect public health, safety and welfare.
Under § 12.15.030(D), any signs for directional control or event advertising must be removed within 24 hours after the event ends, and the organizer is liable for restoring the right-of-way to its prior or improved condition. Police escorts, controls and inspections may be required, and all floats, stands and use-related structures must meet fire and building code requirements. A right-of-way use permit for a fair generally runs up to 180 days under § 12.15.030(D)(3), and applications must be submitted at least 10 working days before the event, or earlier if other city permits are also needed, per § 12.15.040(E), along with the application fee set by the city's fee schedule.
Violations & Fines
Occupying the right-of-way for a fair or festival without a permit is declared a public nuisance under SMC § 12.15.200, exposing the organizer to the enforcement procedures and penalties of Chapter 20.30 SMC. The director can also revoke an issued permit under § 12.15.190 if the event does not proceed as approved, endangers the public or adjoining property, or if the applicant misrepresented material facts in the application.
Frequently Asked Questions
Does Shoreline require a permit for a street fair?
How far ahead must organizers apply?
What happens if a fair runs without a permit?
How long can a street fair permit last?
Sources & Official References
Other rules in Shoreline
Compare Shoreline to another location·View the Washington special events & permits overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Street Fair Rules in Nearby Cities
How other cities in King County handle street fair rules.