Swimming pool permit rules in Montgomery, AL, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit required
Before any excavation begins
Residential pool fee
Construction cost x 0.0025
Base permit fee
$75 for res/comm permits
Late-start penalty
100% of permit fee (Sec. 109.4)
Public pool permit
County health dept. plan approval first
Enforcing agency
City Inspections Division

Summary

Montgomery requires a building permit before work starts on any residential swimming pool, issued under the city's adopted International Pool and Spa Code. The permit fee runs at a construction-cost rate of 0.0025, and excavated soil cannot leave the lot without the property owner's written consent submitted at permit time.

105.1.1 Disposal of excavated soil. No soil from excavation of a pool shall be dumped or placed on any private or public property without the written consent of the owner. This consent shall be submitted at the time a permit for the construction of the pool is obtained. Any soil or debris spilled on the public streets or sidewalks shall be removed immediately. Failure to do so will result in all work being stopped until it is satisfactorily removed and the area cleaned.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27).

Full Breakdown

The City of Montgomery adopted the International Pool and Spa Code, 2024 edition, as part of Chapter 5, Article III of the City Code (Sec. 5-71(h)), governing every permanent or temporary pool or spa connected to a circulation system. 1 requires that no soil excavated for a pool be dumped or placed on any private or public property without the owner's written consent, and that consent must be filed with the city at the time a permit for the construction of the pool is obtained, confirming the permit is a prerequisite to digging.

Soil or debris spilled on public streets or sidewalks must be removed immediately or all work is stopped until the area is cleaned. 2 schedule adopted at Sec. 0025, on top of the $75 base permit fee that applies to residential and commercial building permits generally. Re-inspections cost nothing on the first return trip, $50 for a second re-inspection, and $100 for a third or later trip. 2 bars issuance of a building permit for a public pool or spa until the county health department approves the plans, and the pool cannot operate without an annual health department operation permit. Montgomery's Inspections Division reviews and issues the permit before excavation legally begins.

Violations & Fines

Building or excavating a pool before the permit issues triggers Subsection 109.4: a fee equal to 100 percent of the original permit fee, charged in addition to the fee itself. Dumping excavated soil off-site without the owner's written consent, or leaving spilled soil or debris on a public street or sidewalk, stops all work until the site is cleaned to the inspector's satisfaction.

Frequently Asked Questions

Do I need a permit to build a swimming pool in Montgomery, Alabama?
Yes. Montgomery's adopted International Pool and Spa Code requires a building permit before any pool is excavated or constructed. Subsection 105.1.1 ties written consent for dumping excavated soil to the time a permit for the construction of the pool is obtained, making the permit a precondition of digging.
How much does a residential pool permit cost in Montgomery?
The fee equals the construction cost multiplied by 0.0025, per the IBC Section 109.2 fee schedule Montgomery adopted at Code Section 5-71(a). That amount is separate from the $75 base permit fee charged on residential and commercial building permits generally.
What happens if I start building a pool before getting a permit?
Subsection 109.4 imposes a fee equal to 100 percent of the original permit fee for any work commenced before the permit issues, on top of the permit fee itself, so starting early roughly doubles the city's charge.
Where can I put the dirt dug out of my pool excavation?
Nowhere off your own property without the owner's written consent, filed with the city when you get the permit under Subsection 105.1.1. Soil or debris spilled onto a public street or sidewalk must be removed immediately or the city halts all work until it is cleaned up.

Sources & Official References

Other rules in Montgomery

All Montgomery rules

Compare Montgomery to another location·View the Alabama swimming pools & spas overview

Get notified when Pool Permits in Montgomery, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.