Roseville, MN Swimming Pools & Spas: Pool Permits (2026)
Swimming pool permit rules in Roseville, MN, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.
Key Facts
- Permit trigger: capacity
- Over 3,000 gallons
- Permit trigger: depth
- Over three feet and six inches of water
- Overhead wiring clearance
- Ten feet horizontally from pool edge, diving structure or platforms
- Safety fencing
- Completely installed before filling the pool
- Multiple-family pools
- Water surface and pumps at least 50 feet from any lot line
- Pool electrical fee (2026)
- $120.00 plus circuits at $12.00 each
Summary
Roseville requires a building permit for any swimming pool with a capacity over 3,000 gallons or a depth of over three feet and six inches of water. The application must show the pool type and size plus a detailed site plan, and required safety fencing must be completely installed before the pool is filled.
A building permit shall be required for any swimming pool with a capacity over 3,000 gallons or with a depth of over three feet and six inches of water. The permit fee shall be as listed in the city fee schedule.
Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 2).
Full Breakdown
Section 905.01 sets the trigger: a building permit is required for any swimming pool with a capacity over 3,000 gallons or with a depth of over three feet and six inches of water, with the fee listed in the city fee schedule. Section 905.02 spells out the application. It must show the type and size of pool and a site plan indicating the location of the pool; the location of the house, garage, fencing and other improvements on the lot; structures on all adjacent lots; the filter unit, pump and wiring; backflush and drainage outlets; a grading plan, finished elevations and final treatment (decking, landscaping, etc.) around the pool; existing overhead or underground wiring, utility easements and trees; and any water heating unit.
Section 905.03 attaches conditions to the permit. Pools cannot sit beneath overhead utility lines or over underground utility lines. No pool can be placed under service drop conductors or other open overhead wiring, or within ten feet horizontally from the pool edge, diving structure, observation stands, towers or platforms. All construction access must be over the owner's land. Required safety fencing must be completely installed prior to filling a pool, and filling from fire hydrants or draining into public streets or drainageways requires permission of the appropriate city officials. Pool location in the yard is governed by section 1011.12(b)(4).
Other permits can apply. Removing an in-ground pool needs a demolition permit under section 901.07(d). The Appendix A electrical fee table lists a swimming pool (up to two inspections) at $120.00 plus circuits at $12.00 each. Pools for multiple-family dwellings must keep the water surface and pumps at least 50 feet from any lot line under section 905.04.
Violations & Fines
Section 102.01(a) makes a violation of the city Code a misdemeanor unless the Code provides otherwise: a fine not to exceed $1,000.00, imprisonment not to exceed 90 days, or both. Section 905.03(g) states that nuisances such as undue noise, lighting of adjacent property, health and safety hazards and damage to nearby vegetation shall not be permitted, and section 901.13 makes a permit no defense to a violation charge.
Frequently Asked Questions
When does a Roseville pool need a building permit?
What must a pool permit application include?
Do I need the fence before I fill the pool?
Where can a pool not go in Roseville?
Sources & Official References
Other rules in Roseville
Compare Roseville to another location·View the Minnesota swimming pools & spas overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Pool Permits in Nearby Cities
How other cities in this county handle pool permits.