Skip to main content
CityRuleLookup

New Berlin, WI Trash & Recycling: Dumpster Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Access-side gate
Solid gate, minimum 5 feet tall
Other visible sides
Solid wall, minimum 6 feet tall
Wall design
Must match building architecture
Alternative screening
Requires Plan Commission approval
Governing section
§ 275-56 G(2), Landscaping and Buffering

Summary

Every dumpster in New Berlin must be screened from public right-of-way view under the zoning code's landscaping and buffering standards. The access side needs a solid gate at least five feet tall that stays closed except during pickup, and any other visible side needs a six-foot solid wall matching the building's architecture, per Section 275-56 G(2).

(2)Screening of dumpsters.(a)Applicability. All dumpsters shall be screened from view from any public right-of-way according to the following provisions.(b)Required screening.[1]Access to dumpster. One side of the dumpster shall remain accessible for refuse removal and shall be screened by a solid gate with a minimum height of five feet. The gate shall be maintained in good working order and shall remain closed except when refuse pickups occur.[2]Additional screening. Any side of a dumpster that is not used for access and is visible from a public right-of-way shall be screened from view by a solid wall with a minimum height of six feet. The wall shall be architecturally compatible with other buildings and structures on the site.[3]Alternative screening. Alternative screening methods may be permitted with the approval of the Plan Commission.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 3 Update 1).

Full Breakdown

Section 275-56 G(2) of the New Berlin Code of Ordinances requires that all dumpsters be screened from view from any public right-of-way. The side used for refuse removal must remain accessible but is required to carry a solid gate at least five feet high, kept in good working order and closed at all times except when the pickup truck is actually servicing the container. Any other side of the dumpster that faces or is visible from a public right-of-way needs a solid wall at least six feet tall, and that wall has to be architecturally compatible with the rest of the buildings and structures on the site, not just a bare block or chain-link enclosure.

The Plan Commission can approve alternative screening methods under Subsection (2)(b)[3] if the standard gate-and-wall approach does not fit a site. This screening duty sits inside the same landscaping and buffering article that requires mechanical equipment, ground-mounted utilities and loading, trash and utility areas generally to be hidden from street and side-path views under Section 275-59 D(5). Everyday municipal trash and recycling carts used for weekly residential pickup are carved out of the separate accessory-structure refuse container rule in Section 275-42 P, which instead defers commercial and multifamily dumpsters to Chapter 220 of the Municipal Code and to this landscaping chapter's screening standard.

A property that installs a dumpster enclosure without meeting the gate height, wall height or architectural-compatibility requirements is out of compliance with its approved site or landscape plan and can be cited the same as any other zoning violation.

Violations & Fines

Failure to screen a dumpster as required is a zoning violation enforced under Sections 275-66 through 275-69. The Director inspects and gives written notice, with 30 days to correct a nonemergency violation. Penalties follow the citywide general penalty, Section 1-18: $5 to $1,000 forfeiture plus prosecution costs for a first offense, $10 to $1,000 for a repeat violation within a year, and each day the screening remains noncompliant counts as a separate offense.

Frequently Asked Questions

Does every commercial dumpster in New Berlin need to be screened?
Yes. Section 275-56 G(2) requires all dumpsters to be screened from view from any public right-of-way, with a minimum five-foot gate on the access side and a six-foot solid wall on any other visible side.
Can a chain-link enclosure with slats satisfy the dumpster screening rule?
No. The screening standard calls for a solid wall at least six feet tall that is architecturally compatible with the surrounding buildings, not a chain-link or slatted fence; Section 275-56 H(1)(c) separately bars chain-link from any screening or buffering role in the city.
What happens if a business leaves the dumpster gate open outside of pickup times?
The gate is required to remain closed except when refuse pickups are occurring, so leaving it open is a violation of Section 275-56 G(2)(b)[1] and can draw a notice from the Director followed by a forfeiture under the general penalty in Section 1-18.

Sources & Official References

Other rules in New Berlin

All New Berlin rules

Compare New Berlin to another location·View the Wisconsin trash & recycling overview

Get notified when Dumpster Rules in New Berlin, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Dumpster Rules in Nearby Cities

How other cities in Waukesha County handle dumpster rules.

Waukesha, WI
Some Restrictions