Key Facts

Permit required before
Any qualifying construction activity begins
Dumpster trigger distance
Within 10 feet of a parkway tree
Fence post spacing
Maximum 8 feet on center
Post depth/height
2 feet into ground, 4 feet above ground
Equipment-crossing ground protection
6-inch wood mulch or 1-inch plywood
Excavation inside root zone
Requires Forester approval, possible root pruning

Summary

The Village of Oak Park, Cook County, Illinois, requires a permit before any construction activity that could affect a parkway tree, under Village Code Section 25-1-7. Excavation, equipment crossing the parkway, material storage near a tree, or a dumpster within 10 feet of a parkway tree all trigger fencing and root-protection requirements enforced by the Village Forester.

A. Parkway trees and their root zones must be protected during construction under any of the following circumstances: 1. Excavation on the parkway. ... ... B. The applicant must apply for and receive a permit before any activity begins. The permit application must include a sketch showing the location of all protected parkway trees, their trunk diameter at breast height, the location and dimensions of any excavation, and the proximity to the protected parkway tree. C. Prior to and during construction, fencing must be erected and maintained around the root protection zone of all protected parkway trees. The fence shall protect the area between the sidewalk and curb for the width of the parkway.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-9: Code current through: Ord. 26-159, passed - -2026).

Full Breakdown

Section 25-1-7(A) lists the triggers requiring parkway tree protection during construction: excavation on the parkway, powered wheeled or tracked equipment crossing the parkway off a driveway, construction materials or spoils stored on the parkway, a refuse dumpster within 10 feet of a parkway tree, or a Village inspector's determination that the work could affect a tree's health or safety. Section 25-1-7(B) requires the applicant to apply for and receive a permit before any such activity begins, submitting a sketch showing all protected parkway trees, their trunk diameter at breast height, and the location and dimensions of the planned excavation relative to each tree.

Once a permit issues, Section 25-1-7(C) through (F) require fencing erected and maintained around the root protection zone, the area between sidewalk and curb for the width of the parkway, using steel or wood posts set 1 inch by 2 inches, spaced at most 8 feet on center, driven at least 2 feet into the ground with 4 feet standing, wrapped with snow fence, chain link, or similar highly visible material, all built to the Village's Mandatory Tree Protection Specifications. Section 25-1-7(G) requires the Forester's approval, and possibly root pruning under the same specifications, for any excavation inside the root protection zone.

Where equipment must cross the parkway outside that zone, Section 25-1-7(H) requires a maintained 6-inch layer of wood mulch or chips, or 1-inch plywood sheets, to protect the ground. Section 25-1-7(J) bars cleaning equipment or storing hazardous materials such as paint, oil, solvents, or concrete within the root protection zone, and Section 25-1-7(K) bars fastening wires, signs, or attachments to a parkway tree.

Violations & Fines

Violating Section 25-1-7's parkway tree protection requirements is punishable under Section 25-1-8 by a fine set under the Village's Section 1-1-5 general penalty schedule. If the violation injures, mutilates, or kills a tree on Village-owned property, the violator must also bear the cost of repair or replacement, valued under the International Society of Arboriculture's Guide for Plant Appraisal.

Frequently Asked Questions

Do I need a permit to work near a parkway tree in Oak Park?
Yes, if the work involves excavation on the parkway, equipment crossing it off a driveway, material or dumpster storage near a tree, or anything a Village inspector flags as a risk. Section 25-1-7(B) requires a permit and a sketch of the affected trees before work starts.
How must a parkway tree be fenced during construction in Oak Park?
Section 25-1-7(D) and (E) require steel or wood posts, 1 by 2 inches, spaced at most 8 feet apart, set 2 feet into the ground with 4 feet standing, wrapped with snow fence, chain link, or similar highly visible material around the tree's root protection zone.
Can I excavate inside a parkway tree's root protection zone?
Only with the Forester's approval. Section 25-1-7(G) requires Forester sign-off before any cut or fill in the root protection zone, and root pruning may be required under the Village's Mandatory Tree Protection Specifications.

Sources & Official References

Other rules in Oak Park

All Oak Park rules

Compare Oak Park to another location·View the Illinois tree protection overview

Get notified when Parkway Planting in Oak Park, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Parkway Planting in Nearby Cities

How other cities in Cook County handle parkway planting.

Oak Lawn, IL
Some Restrictions
Tinley Park, IL
Some Restrictions
Chicago, IL
Some Restrictions
Schaumburg, IL
Some Restrictions
Skokie, IL
Some Restrictions
Evanston, IL
Some Restrictions