Key Facts

Trigger
Required only when directed by Public Works Dept
Pipe size/material
8-inch ductile iron
Pipe marking
Painted purple, labeled non-potable water
Placement
South or east shoulder of right-of-way
Standard
Must meet City Water Reuse Standards
Connection duty
Owner must connect for any irrigation meter

Summary

When South Fulton's Public Works Department requires it, new subdivisions must install a dedicated reuse water irrigation main to every lot under Subdivision Regulations Section 9.3.5. The line runs as 8-inch purple-painted ductile iron pipe labeled non-potable water, built to the City Water Reuse Standards, and any property owner who requests an irrigation meter must tie into that reuse main once it is activated.

When required by the Public Works Department, a reuse water irrigation distribution system to each lot shall be installed. This system shall consist of an 8-inch diameter ductile iron pipe identified an "non-potable water," painted purple in accordance with standard pipe identification schedules and installed on the south or east shoulder of the right or way limit. All pipes and appurtenances must be in accordance with the City Water Reuse Standards. Each property owner requesting an irrigation meter shall connect to the reuse water main, if activated.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 13 Update 1).

Full Breakdown

South Fulton's recycled-water rule sits inside the Subdivision Regulations' water supply article, alongside the standard potable water main requirements. Section 9.3.1 already requires a subdivider to extend public water mains and connect to any public water supply within 300 feet of the development, and Section 9.3.4 sets fire hydrant main sizing at a minimum 8-inch diameter. Section 9.3.5 adds a parallel non-potable system: when the Department of Public Works determines a reuse water irrigation distribution system is needed, the subdivider must install one to every lot in the subdivision, not just to common areas.

The specification is exact. The reuse main must be 8-inch diameter ductile iron pipe, labeled non-potable water and painted purple, the standard color code for reclaimed water lines, so contractors and future excavators can distinguish it from the drinking-water main. The regulation also fixes where the pipe goes: it must be installed on the south or east shoulder of the right-of-way limit, keeping it on a consistent, predictable side of the street across the subdivision. Every component, pipe and appurtenances alike, has to meet the City's own Water Reuse Standards, a separate technical document the Public Works Department maintains.

The connection obligation runs to individual property owners, not just the developer. Once the reuse main is activated, any owner who wants an irrigation meter for landscape watering has to connect to that non-potable main rather than run irrigation off the potable water system, tying recycled water use to irrigation demand and off the drinking-water side of the utility.

Violations & Fines

A subdivider who skips the required reuse main, uses the wrong pipe material or diameter, fails to paint it purple, or places it on the wrong side of the right-of-way will not get as-built drawings accepted or final plat approval from the Department of Public Works. A property owner who connects an irrigation system to the potable water main instead of an activated reuse main after being required to tie in is out of compliance with Section 9.3.5 and the City Water Reuse Standards.

Frequently Asked Questions

Does every South Fulton subdivision need a recycled water line?
No. Section 9.3.5 only requires a reuse water irrigation distribution system when required by the Public Works Department, so it applies to subdivisions where Public Works determines one is needed, not automatically to every new development in the city.
What does South Fulton's reuse water main look like?
It is 8-inch diameter ductile iron pipe, marked non-potable water and painted purple so crews can tell it apart from drinking-water lines, installed along the south or east shoulder of the right-of-way and built to the City's Water Reuse Standards under Section 9.3.5.
Do I have to connect to the reuse water main?
If you want an irrigation meter and the reuse main serving your lot has been activated, yes. Section 9.3.5 requires each property owner requesting an irrigation meter to connect to the reuse water main rather than draw irrigation water from the potable system.

Sources & Official References

Other rules in South Fulton

All South Fulton rules

Compare South Fulton to another location·View the Georgia water use rules overview

Get notified when Recycled Water Rules in South Fulton, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Recycled Water Rules in Nearby Cities