Kenner, LA Zoning Overlays & Bonuses: Downtown Design Guide (2026)
Key Facts
- District
- Rivertown Historic District, Sec. 6.13
- Review body
- Historic District Design Commission
- Commission size
- 5 members, 1 must be an architect
- Applies to
- New construction, alteration, repainting
- Fine for violation
- Up to $100 and/or 90 days jail
Summary
New construction, alterations, and even repainting in Kenner's Rivertown Historic District, the city's historic downtown along Williams Boulevard, must go through the Historic District Design Commission under UDC Section 6.13 before the Director of Inspections and Code Enforcement will issue a building permit.
(a)Purpose and Intent: To maintain and improve the urban environment and economic viability, while helping to preserve and control the physical historic appearance and quality of construction within the District. ... (f)Intent of Rivertown Historic District Design Guidelines:(1)The RHD design guidelines represent an effort to review the architectural style and substance, as well as the urban spatial impact of any new construction or renovation within the Rivertown Historic District.(2)The implementation of the design guidelines will allow the Historic District Design Commission to make design, siting, and landscaping recommendations that must be met before the permitting process is initiated. ... (j)Application Submittal Process:(1)Historic District Design Review: Before the commencement of any work in the erection of any new building or in the alteration or addition to, or painting or repainting or demolishing of any existing building, any portion of which is to front on any public street or alley in the Rivertown Historic District, application by the owner or owner representative for a permit therefore shall be made to the Historic District Design Commission.
Full Breakdown
Kenner's downtown design controls live in Article VI, Section 6.13 of the Unified Development Code as the Rivertown Historic District (RHD), bounded by Williams Boulevard between Airline Drive and the Mississippi River and the area bounded by Kenner Avenue, the river, Webster Street and Oxley Street. Section 6.13(f) states the design guidelines exist to review the architectural style, substance, and urban spatial impact of any new construction or renovation in the District, and Section 6.13(f)(2) gives the five-member Historic District Design Commission, four residents and one licensed architect appointed by the Mayor with City Council approval, the power to make design, siting, and landscaping recommendations that must be satisfied before the permitting process begins.
Section 6.13(j) requires any owner planning to erect, alter, add to, paint, repaint, or demolish a building fronting a public street or alley in the District to apply to the Commission first; the applicant must submit elevations, a site plan, a landscaping plan, floor plans, and a roof plan, and the Commission votes to approve the project or require changes before the Director of Inspections and Code Enforcement will issue the actual building permit. The design standards themselves, in Section 6.13(k), regulate fascia depth, façade materials such as wood, brick, Hardiboard siding and stucco, paint color families like the Sherwin Williams Vieux Carré collection, canopy clearance, and sign size, limiting most single-faced wall signs to eight square feet.
Within the Commercial Core shown on Figure VI-1, buildings are exempt from the district's underlying area and setback rules under Section 6.13(e)(1); outside the Core, the zoning district's normal setbacks still apply.
Violations & Fines
Starting work in the Rivertown Historic District without Historic District Design Commission approval, or violating an approved design condition, is enforced by the Director of the Department of Inspections and Code Enforcement, who can stop work under Section 6.13(k)(10) and prosecute the responsible party. Section 6.13(k)(12) sets a general penalty for RHD violations of a fine not exceeding $100 and imprisonment for not more than 90 days, or both, with each day of continued violation a separate offense.
Frequently Asked Questions
Do I need approval to repaint a building in Kenner's Rivertown district?
Who sits on Kenner's Historic District Design Commission?
What happens if I build in Rivertown without Design Commission approval?
Sources & Official References
Other rules in Kenner
Compare Kenner to another location·View the Louisiana zoning overlays & bonuses overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.