Bartow County, GA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required for
building, electrical, gas, mechanical, plumbing work
Issued by
Bartow County building official
Prerequisite approvals
lawful lot, water/sewer tap under §§ 18-114, 18-118
First-violation fine
$200.00
Max jail exposure
60 days, § 18-388

Summary

Unincorporated Bartow County requires a permit before anyone builds, enlarges, alters, repairs, or changes the occupancy of a building or structure, or works on its electrical, gas, mechanical, or plumbing systems. Starting any such regulated construction or land-disturbing work before the permit issues is unlawful under the county's building code.

These county ordinances apply to unincorporated areas of Bartow County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, or change the occupancy of a building or a structure, or to erect, install, enlarge, alter, repair, convert or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the standard building codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work, except as exempted below. ... It shall be unlawful to commence construction of a building or structure requiring a permit without first obtaining a permit, as required herein.

Full Breakdown

' The same section separately requires anyone opening a new non-residential business, or a new tenant occupying an existing non-residential structure, to notify the building official and pass an inspection before getting a business license or beginning tenancy, though residential tenants such as apartment renters are exempt from that notice step. Section 18-117 also makes it 'unlawful to commence construction of a building or structure requiring a permit without first obtaining a permit,' and separately unlawful to start land-disturbing activity, moving, or alteration of a building, or development of land not requiring a building, until every necessary permit has issued.

Before a permit can be released, § 18-114 requires the lot be a lawful lot of record, § 18-118 requires proof of other county approvals such as water and sewer taps, and § 18-119 bars issuance to anyone currently in violation of the chapter or under an active stop-work order. Bartow County Community Development's building official, under § 18-116, administers the permit system for the eight adopted standard building codes listed at § 18-31.

Violations & Fines

Starting regulated construction without the § 18-117 permit is unlawful and can be prosecuted criminally in magistrate court under § 18-385, pursued civilly in superior court under § 18-386, or stopped immediately with a stop-work order under § 18-387. The mandatory fine schedule in § 18-421 runs $200.00 for a first violation, $400.00 for a second, and $600.00 for a third or subsequent violation, capped at $1,000.00 per offense, with added criminal penalties of up to 60 days in jail under § 18-388.

Frequently Asked Questions

When does Bartow County require a building permit?
§ 18-117 requires a permit before anyone constructs, enlarges, alters, repairs, or changes the occupancy of a building or structure, or installs, alters, converts, or replaces an electrical, gas, mechanical, or plumbing system regulated by the county's adopted standard building codes.
Can I get a permit for any lot in unincorporated Bartow County?
No. § 18-114 limits building permits to lawful lots of record, and § 18-118 additionally requires proof of approvals from other county departments, such as a water tap, sewer tap or septic permit, and a driveway permit, before the building official will release any permit.
What happens if I build without a permit?
§ 18-117 makes it unlawful to commence permit-requiring construction without first obtaining one. The building official can issue a citation or a stop-work order under § 18-387, with mandatory fines of $200.00 to $600.00 per § 18-421's schedule and up to 60 days in jail under § 18-388 for criminal violations.

Sources & Official References

Other rules in Bartow County

All Bartow County rules

Compare Bartow County to another location·View the Georgia building safety overview

Get notified when Building Permits in Bartow County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.