Greece, NY Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
§ 114-8, Permits
Non-structural repair exemption
No permit if no plumbing/electrical/HVAC/fire work
Permit expiration if unstarted
Void after 6 months
Typical permit term
1 year unless set otherwise
Penalty
Up to $1,000/day or 1 year jail, § 114-17

Summary

No one may erect, construct, enlarge, alter, remove, demolish, convert or change the occupancy of a building or structure in Greece without first getting a permit from the Building Inspector, though non-structural repairs that skip plumbing, electrical, HVAC, fire protection or solid-fuel systems are exempt.

No person, firm or corporation shall commence erection, construction, enlargement, alteration, removal, improvement, demolition, conversion or installation therein of any building or structure or change in nature the occupancy classification pursuant to this chapter of any building or structure without first obtaining an appropriate permit from the Building Inspector, except that no permit shall be required for the performance of repairs which are not structural in nature and do not entail plumbing, electrical, heating, ventilation systems or components, fire protection or detection equipment, affect existing or the addition or alteration of a solid-fuel-burning installation or appliance.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4702072; v22 updated 2025-08-21; through 08-21-2025).

Full Breakdown

Section 114-8(A)(1) bars commencing erection, construction, enlargement, alteration, removal, improvement, demolition, conversion or a change in occupancy classification of any building or structure without first obtaining an appropriate permit from the Building Inspector, carving out only repairs that are not structural in nature and don't touch plumbing, electrical, heating, ventilation, fire protection/detection equipment or solid-fuel-burning appliances. The application must come from the owner, lessee, or their agent, architect, engineer or builder, and for work regulated under Education Law §§ 7209 and 7307, plans must bear the signature and seal of a licensed engineer or registered architect.

The Building Inspector may require liability insurance naming the Town as additionally insured and proof of workers' compensation and disability coverage before issuing the permit, per § 114-8(A)(5). Once issued, a permit is void if work doesn't start within six months (§ 114-8(C)(4)), generally runs for one year unless the Building Inspector sets a different period, must be posted on the job site while work is in progress, and cannot be transferred if ownership, use, size or type of operation changes. The Building Inspector can revoke a permit under § 114-8(D) for false statements in the application, a permit issued in conflict with applicable law, or failure to comply with a stop-work order, and a denied or disapproved applicant can appeal to the Board of Review under § 114-7.

Violations & Fines

Willfully failing to comply with a written Building Inspector order, or otherwise violating Chapter 114 or a permit issued under it, is punishable under § 114-17(A) by a fine of not more than $1,000 per day of violation, imprisonment not exceeding one year, or both, with each day the violation continues counted as a separate offense. The Town may also go to court for an injunction to compel compliance or vacate an occupancy in cases of imminent danger, under § 114-17(B).

Frequently Asked Questions

Do I need a permit for a small repair on my Greece home?
Not always. Section 114-8(A)(1) exempts repairs that are not structural and don't involve plumbing, electrical, heating, ventilation, fire protection/detection equipment, or a solid-fuel-burning appliance; anything beyond that needs a Building Inspector permit first.
How long is a building permit good for in Greece, NY?
Under § 114-8(C)(4), the permit becomes void if work hasn't started within six months of issuance, and per § 114-8(B)(4) it otherwise continues for one year unless the Building Inspector sets a different period at issuance.
What happens if I build without a permit in Greece?
Section 114-17(A) makes a violation of Chapter 114, including unpermitted work covered by a Building Inspector order, punishable by a fine of up to $1,000 per day of violation, imprisonment up to one year, or both, with each day counted separately.

Sources & Official References

Other rules in Greece

All Greece rules

New York rules heatmap·Compare Greece to another location·View the New York building safety overview

Get notified when Building Permits in Greece, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Monroe County handle building permits.

Rochester, NY
Some Restrictions