Noblesville, IN Building Safety: Building Permits (2026)
Key Facts
- Governing section
- § 154.15
- Issuing authority
- Director of Planning
- Fee payment
- to the Clerk-Treasurer
- Work start deadline
- within 6 months of issuance
- Work completion deadline
- within 24 months
Summary
The City of Noblesville requires a permit before any construction, alteration, repair, or demolition of a building or structure begins, per Noblesville Code of Ordinances § 154.15, with applications reviewed by the Director of Planning and fees paid to the Clerk-Treasurer.
A permit shall be obtained before beginning construction, alteration, repair, or demolition of any building or structure, using application forms furnished by the Director, and all fees required by this code shall be paid to the Clerk-Treasurer. Application fees shall be determined in accordance with Ordinances 1513 and 1522, as amended. ... The work or use authorized by a building permit shall commence within six months of the date of issuance of such permit. Otherwise, the same shall lapse and become null and void. All work so authorized shall be completed within 24 months from the date of issuance of the permit unless good cause for extending the completion time is shown the Director of Planning.
Full Breakdown
Noblesville Code of Ordinances § 154.15, PERMIT REQUIRED, states that a permit shall be obtained before beginning construction, alteration, repair, or demolition of any building or structure, using application forms furnished by the Director, with all fees required by the code paid to the Clerk-Treasurer, application fees set under Ordinances 1513 and 1522, as amended. Section 154.16 requires the application to include a plat or sketch of the proposed location showing lot boundaries, plans and specifications showing the work to be done, and, where a state design release under I.C.
22-15-3-1 applies, a copy of that release from the State Building Commissioner and State Fire Marshal before the Building Commissioner issues the permit. Section 154.17 directs the Director of Planning to review every application for full code compliance and for flood-plain safety where new construction, substantial improvements, or major repairs sit in a special flood hazard area. Section 154.20 sets timing: work authorized by a permit must commence within six months of issuance or the permit lapses and becomes void, and all authorized work must be completed within 24 months unless the Director of Planning shows good cause for an extension; once a certificate of occupancy issues, the applicant must occupy the certified structure within 30 days. This entire chapter traces to Ord. 1664, passed May 4, 1988.
Violations & Fines
Section 154.15 cross-references § 154.99, which fines any person, firm, or corporation violating a Chapter 154 provision, including building without a required permit, up to the maximum penalty allowed by state statute, with each day of the unpermitted activity constituting a separate offense.
Frequently Asked Questions
When does Noblesville require a building permit?
How long is a Noblesville building permit valid before work must start?
What must be submitted with a Noblesville building permit application?
Sources & Official References
Other rules in Noblesville
Compare Noblesville to another location·View the Indiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.