Key Facts

Governing section
Village Code § 8-21 (Permits and administration)
Survey deadline
Within 10 business days of foundation inspection
Utility condition
Water/sewer mains within 250 ft of property line
Permit expiration
1 year (3 months for express/demolition permits)
Unpermitted work penalty
50% fee surcharge, capped $500

Summary

Palatine requires a building permit before any construction that is not completely in conformity with the Palatine Code, and section 8-21 layers extra conditions on top of the adopted International codes, including a post-foundation survey and, for new residential construction, proof that water and sewer mains reach the property.

(a)Survey.(1)After the foundation of a new building or any addition to an existing building has been completed, the applicant shall furnish a survey prepared by a registered state surveyor showing the dimensional location of such foundation, and including the following required information:a.Accurate dimensions of front yard, side yards and rear yard setbacks;b.United States Geographical Survey (USGS) elevations of top of foundation at all corners and top of curb or crown of street. ... (a)No permit shall be issued for the erection of any building or structure which is not completely in conformity with the applicable provisions of the Palatine Code.(b)No permit shall be issued hereunder for any premises unless the sanitary sewer mains and water mains of the village shall have been extended within rights-of-way or easements to the furthest property line of the premises if readily accessible within 250 feet from the property line.

Full Breakdown

Village Code § 8-21, Permits and administration, amends section R105.1 of the 2021 International Residential Code and section 105.1 of the International Building Code to add that no permit shall be issued for erecting a building or structure that is not completely in conformity with the applicable provisions of the Palatine Code, and that no permit shall issue for a residential premises unless the sanitary sewer mains and water mains have been extended within rights-of-way or easements to the furthest property line, if reasonably accessible within 250 feet, or unless a temporary permit or bonded improvement agreement is in place.

Section 8-21(a) separately requires that after a new building's or addition's foundation is completed, the applicant furnish a survey from a registered state surveyor showing accurate front, side, and rear yard setback dimensions and USGS elevations at the foundation corners and curb, filed within ten business days of the foundation inspection, with a further final topographical survey required before grading is approved. The section also amends the permit expiration rule so that an issued permit expires if the work is not completed within one year, with all fees forfeited unless an extension is requested in writing 30 days before expiration, and an express or demolition permit expires after three months on the same terms. Section 8-20 assigns administration of these amended code sections to the community development director or a designee.

Violations & Fines

Building or adding to a structure without a permit, or without the required post-foundation and final topographical surveys, is enforced under section 8-21's code amendments. Under section 8-22(8), commencing work without first securing the permit increases the building permit fee by 50 percent, capped at $500.00, and an unremoved above-ground improvement after a permit expires must be removed and the site restored within 30 days.

Frequently Asked Questions

When must a building permit survey be filed in Palatine?
Section 8-21(a) requires the applicant to furnish a foundation survey from a registered state surveyor showing setback dimensions and elevations, and that survey or spotted plat must be filed and approved within ten business days from the date of the foundation inspection.
Can Palatine deny a residential building permit over utilities?
Yes. Section 8-21(b) amends the adopted code to bar issuing a residential building permit unless sanitary sewer and water mains have been extended to the property line where reasonably accessible within 250 feet, unless a temporary permit or bonded improvement agreement covers the gap.
How long is a Palatine building permit valid before it expires?
Section 8-21(b)(3) provides that an issued building permit expires one year after issuance if the work is not completed, forfeiting all permit fees, unless the owner requests a written extension at least 30 calendar days before expiration; express and demolition permits expire after three months on the same terms.

Sources & Official References

Other rules in Palatine

All Palatine rules

Compare Palatine to another location·View the Illinois building safety overview

Get notified when Building Permits in Palatine, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Cook County handle building permits.

Skokie, IL
Some Restrictions
Oak Lawn, IL
Some Restrictions
Oak Park, IL
Some Restrictions
Arlington Heights, IL
Some Restrictions
Chicago, IL
Some Restrictions
Evanston, IL
Some Restrictions
Tinley Park, IL
Some Restrictions
Schaumburg, IL
Some Restrictions