Paola, KS Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Issuing officer
Code Official, Community Development Department
Retaining wall exemption
Not over 3 feet, unless supporting a surcharge
Application abandoned
180 days after filing
Permit invalid if not started
180 days after issuance
Building permit expires
Unless completed and approved within 1 year
Fine on conviction
Not to exceed $500.00
Work before permit
Double the normal permit fee

Summary

In Paola, an owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure must first apply to the Code Official and obtain a permit under City Code § 4-105. Retaining walls up to three feet, finish work and small prefabricated pools are exempt.

(a) Required. Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done shall first make application to the Code Official and obtain the required permit. ... (b) Work Exempt From Permit. Permits shall not be required for the following. ... (B) Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. (C) Prefabricated swimming pools that are less than twenty-four (24) inches (610 mm) deep and do not exceed five thousand (5,000) gallons (18,927 L). ... (E) Privately owned swings and other playground equipment installed at single-family or duplex structures.

Full Breakdown

Section 4-105(a) of the Paola City Code reaches two kinds of work. One is work on the building itself: construct, enlarge, alter, repair, move, demolish or change the occupancy. The other is work on an electrical, gas, mechanical or plumbing system whose installation the building code regulates. A contractor who regularly employs one or more qualified trade persons can ask for an annual permit in place of an individual permit for each alteration to an already approved electrical, gas, mechanical or plumbing installation and must keep a detailed record of the alterations.

Section 4-105(b)(1) lists the building work that needs no permit: retaining walls not over three feet measured from the bottom of the footing to the top of the wall, unless supporting a surcharge; painting, papering, tiling, carpeting, cabinets and counter tops; prefabricated swimming pools under 24 inches deep and not over 5,000 gallons; shade cloth structures for nursery or agricultural use; privately owned swings and playground equipment at single-family or duplex structures; and movable cases, counters and partitions not over five feet nine inches high. An exemption never authorizes work done in violation of the code. For emergency equipment replacements and repairs, the application is due within the next working business day (§ 4-105(c)).

The application is a written form furnished by the Community Development Department. It identifies and describes the work, describes the land by legal description or street address, states the use and occupancy, comes with the construction documents required by § 4-106, states the valuation of the work and carries the signature of the applicant or agent (§ 4-105(f)(1)). An application is deemed abandoned 180 days after filing unless pursued in good faith, with extensions of up to 90 days each on written request (§ 4-105(h)). A permit becomes invalid if work does not start within 180 days of issuance, and a building permit expires unless the work is completed and approved within one year (§ 4-105(j)). The permit card must be posted where it is clearly visible from the roadway before work starts (§ 4-105(o)). Fees follow § 4-301, and Table 1-A begins at $23.50 for a valuation of $1.00 to $500.00. A contractor must also hold a current Paola license before a building permit issues (§ 4-405), and the building code amendment at § 4-201(a)(3)(F) requires an original letter of intent from all contractors listed on the permit before it issues.

Violations & Fines

Starting work before the permit is issued draws double the normal permit fee under the building code amendment at § 4-201(a)(3)(P), and paying it does not excuse compliance. Section 4-301(d) adds an investigation fee equal to the permit fee, which the Code Official can waive for an owner-occupant of a one-family dwelling who applies within one working day after notice. A person convicted of violating the chapter faces a fine not to exceed $500.00, and each day a violation continues can count as a separate offense (§ 4-113).

Frequently Asked Questions

Do I need a permit to repaint or replace cabinets in Paola?
No. Section 4-105(b)(1)(B) exempts painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. Ordinary repairs under § 4-105(d) also need no application, but they cannot include cutting away a wall or partition, removing a structural beam or load-bearing support, changing a required means of egress, or work on supply, sewer, drain, gas, soil, waste or vent piping or electric wiring.
How long does a Paola building permit last?
Under § 4-105(j), the permit is invalid if the work does not start within 180 days of issuance, unless an inspection has been requested, or if work is suspended or abandoned for 180 days. A building permit also expires unless the work is completed and approved within one year. Moving and demolition permits expire 60 days after issuance, and no extension is granted for them.
What happens if I start work before getting the permit?
The permit fee doubles under the amended building code section 109.4, and § 4-301(d) adds an investigation fee equal to the permit fee. The person responsible must also give the Code Official access to inspect the finished work or hire a licensed professional to verify that it complies, at the person's own expense.
Who hears an appeal of a Code Official decision?
The Code Board of Appeals does, under § 4-114. An application for appeal is filed on a form from the Code Official within 20 days after the notice was served, and the Board meets within 10 days of the filing. The Board cannot waive requirements of Articles 1 or 2 of Chapter 4.

Sources & Official References

Other rules in Paola

All Paola rules

Compare Paola to another location·View the Kansas building safety overview

Get notified when Building Permits in Paola, KS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.