Key Facts

Governing standard
ASME A17.1 acceptance and periodic inspections
Acceptance inspection
Before the certificate of occupancy is issued
Report to the City
Copy of acceptance inspection forwarded to the City of Paola
New elevators
Phase I recall and Phase II in-car emergency operation
Existing elevators serving emergency personnel
Travel of 25 feet or more: ASME A17.3 emergency operation
Fine on conviction
Not to exceed $500.00

Summary

Paola requires all elevator equipment to pass an acceptance inspection and test under ASME A17.1 before a certificate of occupancy issues, with a copy forwarded to the City, and to receive periodic inspections and testing under the same standard. New elevators need Phase I emergency recall and Phase II in-car emergency operation.

(W) 3001.6 Acceptance inspections. All elevator equipment shall have an acceptance inspection and test performed and approved in accordance with ASME A17.1 requirements. Prior to the issuance of a certificate of occupancy, a copy of this inspection shall be forwarded to the City of Paola. (X) 3001.7 Periodic inspections. All elevator equipment shall have periodic inspections and testing performed and approved in accordance with ASME A17.1 requirements. ... (Z) 3001.6 Elevators. Where there is an elevator or elevators for public use, at least one (1) elevator serving the area shall comply with this Section. ... New elevators shall be provided with Phase I emergency recall operation and Phase II emergency in-car operation in accordance with ASME A17.1.

Full Breakdown

The elevator rules are local additions to the 2018 International Building Code that Paola adopts in City Code § 4-201, as published by the International Code Council and dated August 31, 2017. Section 4-201(a)(4)(W), numbered 3001.6, covers acceptance inspections. All elevator equipment must have an acceptance inspection and test performed and approved in accordance with ASME A17.1 requirements, and a copy of that inspection must be forwarded to the City of Paola before a certificate of occupancy is issued. Section 4-110(a) bars any building from being used or occupied until the Code Official issues that certificate, so the elevator paperwork sits ahead of occupancy.

Section 4-201(a)(4)(X), numbered 3001.7, covers maintenance after opening day. All elevator equipment must have periodic inspections and testing performed and approved in accordance with ASME A17.1 requirements. The amendment itself prints no interval for those inspections.

Section 4-201(a)(4)(Z) adds design triggers. Where there is an elevator or elevators for public use, at least one elevator serving the area must comply with the section. Existing elevators with a travel distance of twenty-five feet or more above or below the main floor or other level, and intended to serve the needs of emergency personnel for fire-fighting or rescue purposes, must be provided with emergency operation in accordance with ASME A17.3. New elevators must have Phase I emergency recall operation and Phase II emergency in-car operation in accordance with ASME A17.1.

Amendment § 4-201(a)(3)(O), numbered 109.2, ties elevators to the permit system: on buildings, structures, electrical, gas, mechanical, elevator equipment and plumbing systems or alterations requiring a permit, a fee for each permit is paid under the City of Paola fee schedule. The Code Official, who leads the Community Development Department, enforces these provisions under § 4-104.

Violations & Fines

Occupying a building before the Code Official issues the certificate of occupancy violates § 4-110(a), and the City can suspend or revoke a certificate issued in error or on incorrect information, or where the building violates the code (§ 4-110(e)). A person convicted of violating Chapter 4 faces a fine not to exceed $500.00, each day a violation continues can count as a separate offense, and the City can seek an injunction or mandamus (§ 4-113).

Frequently Asked Questions

Does Paola require elevators to be inspected after they open?
Yes. Section 4-201(a)(4)(X) requires all elevator equipment to have periodic inspections and testing performed and approved in accordance with ASME A17.1 requirements. The amendment itself prints no interval. Acceptance testing comes first: before the certificate of occupancy issues, a copy of the acceptance inspection must be forwarded to the City of Paola under § 4-201(a)(4)(W).
What must happen before a Paola building with an elevator can be occupied?
The elevator equipment needs an acceptance inspection and test approved under ASME A17.1, and a copy of the inspection must be forwarded to the City of Paola before the certificate of occupancy is issued. Section 4-110(a) then prohibits use or occupancy until the certificate issues.
Do older elevators need emergency operation?
Existing elevators with a travel distance of twenty-five feet or more above or below the main floor or other level, intended to serve emergency personnel for fire-fighting or rescue purposes, must be provided with emergency operation in accordance with ASME A17.3. New elevators need Phase I recall and Phase II in-car operation.
Is a permit fee charged for elevator work?
Yes. Amendment 109.2 in § 4-201 says that on buildings, structures, electrical, gas, mechanical, elevator equipment and plumbing systems or alterations requiring a permit, a fee for each permit is paid as required under the City of Paola fee schedule.

Sources & Official References

Other rules in Paola

All Paola rules

Compare Paola to another location·View the Kansas building safety overview

Get notified when Elevator Maintenance in Paola, KS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.