Roseville, MN Building Safety: Building Permits (2026)
Key Facts
- Fences and walls
- Permit required over four feet tall, new and replacement
- Other listed items
- Driveways, drain tile, sheds, permanent and temporary signs
- Permit lapse
- 180 days without work starting; 180 days after work stops
- Fire inspection add-on
- Eight percent of the building permit fee
- Construction deposit trigger
- More than 50 percent of existing structure's cost evaluation
- Issuing official
- Designated building official
Summary
Roseville requires permits wherever the Minnesota State Building Code says so, and adds its own permit list: fences and walls over four feet tall, driveways, drain tile, sheds, and signs. Moving a building and demolishing a building or in-ground pool need permits too. The designated building official processes applications and issues the permits.
(a) Permits shall be required as specified in the MSBC. (b) Permits shall be required for the following to verify compliance with the city Code. Fees, based on valuation, shall be as established in the most current city fee schedule. (1) Fences over four feet tall (new and replacement). (2) Walls over four feet tall (new and replacement). (3) Driveways (new and replacement). (4) Drain tile installations (new and replacement). (5) Sheds. (6) Permanent and temporary signage. (c) Moving of dwellings or buildings. (1) Permit required. The applicant for a permit to move a building or dwelling shall pay a fee as established in the city fee schedule. ... (d) Demolition permits. The applicant for a permit to demolish or wreck a building or in-ground pool shall pay a fee as established in the city fee schedule.
Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 2).
Full Breakdown
Section 901.07(a) ties Roseville's permit trigger to the Minnesota State Building Code (MSBC), so any work the MSBC says needs a permit needs one in the city. Subsection (b) adds a city list: fences over four feet tall, walls over four feet tall, driveways and drain tile installations (new and replacement in each case), sheds, and permanent and temporary signage. The stated purpose is to verify compliance with the city Code, and fees are based on valuation under the current city fee schedule. Moving a dwelling or building takes a permit under subsection (c); inspection of buildings outside the city limits is charged at an hourly rate plus a mileage charge for city vehicles. Demolishing a building or an in-ground pool takes a permit under subsection (d). Further subsections cover gas piping and HVAC equipment (e), plumbing (f), excavation, grading and surfacing (g), signs (h), special events and temporary tents (j), and a minimum fee for any permit (k). When a fee depends on market value, the designated building official ascertains the value.
Around the permit itself, section 901.02 has the designated building official receive and process applications, inspect premises, ascertain compliance and issue permits. Under section 901.05 the fee is the fee-schedule amount plus an amount equal to eight percent of the building permit fee to defray the cost of fire safety inspections, and section 901.06 adds the state surcharge. Section 901.08 bars a construction permit until the finance director certifies the lot has been assessed for contiguous public roads, curbs or sidewalks, or the applicant pays the assessable share. Section 901.09 requires a cash deposit when the building official reasonably finds a project involves more than 50 percent of the cost evaluation of the existing structure. Under section 901.12 a permit becomes invalid at the end of 180 days unless work has started, and it expires after work is abandoned or suspended for 180 days. Work in the public right-of-way needs its own permit under section 901.10.
Violations & Fines
Violating Title 9 or any other provision of the city Code is a misdemeanor under section 102.01(a) unless the Code provides otherwise: a fine not to exceed $1,000.00, imprisonment not to exceed 90 days, or both, with costs of prosecution added. Section 901.13 removes one defense: the fact that a permit was issued is no defense to a charge of violating the building title or another regulation.
Frequently Asked Questions
Do I need a permit for a shed in Roseville?
How tall can a fence be before Roseville requires a permit?
How long is a Roseville building permit valid?
Is anything added to the building permit fee?
Do I need a permit to demolish a building or pool?
Sources & Official References
Other rules in Roseville
Compare Roseville to another location·View the Minnesota building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.