Tempe, AZ Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Tempe City Code Sec. 8-105.1
Application method
Online permitting portal
Application validity
1 year, one 180-day extension
Working without permit
Investigation fee = permit fee
Civil sanction range
$400-$1,000/violation, $2,000/day cap

Summary

Tempe requires a building official-issued permit under City Code Sec. 8-105 before constructing, altering, moving or demolishing a building, or before touching its electrical, gas, mechanical or plumbing systems, with permits applied for through the online portal.

105.1 Required. Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish, change the occupancy or change character/use within an occupancy group of a building or portion thereof or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code or the City of Tempe Construction Codes, or to cause such work to be performed, shall first make application to the building official and obtain the required permit prior to any work being done on the project.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: City Code: Supplement 33 Update 4 | Zoning and Development Code: Supplement 11 Update 2).

Full Breakdown

Sec. 1 of the Tempe Administrative Code (City Code Chapter 8) requires any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy or use of a building, or to erect, install, alter, repair, remove, convert or replace an electrical, gas, mechanical or plumbing system, to first apply to the building official and obtain a permit before any work begins. Applications go through the online permitting portal on a Community Development Department form (Sec. 3), must describe the work and land involved, state the estimated valuation, and be signed by the applicant or an authorized agent; a plan review fee is due once the application is deemed administratively complete.

A permit application is valid for one year from filing (extendable once, for 180 days, on payment of a renewal fee equal to 25% or 10% of the original plan review fee depending on the stage), and an issued permit expires if work is not commenced and an approved inspection obtained within one year, or if the work is suspended for a year, triggering a reinstatement fee based on the value of the uncompleted work. 2 exempts a defined list of minor work from permitting, including fences up to seven feet, retaining walls not over four feet, radio/TV antennae and flagpoles under 35 feet, tool sheds under 200 square feet, and prefabricated pools under 5,000 gallons and less than 18 inches deep.

Building permit and plan review fees are set annually by City Council resolution and adjusted each July 1 to the Consumer Price Index under Sec. 1. Anyone who starts work before obtaining the necessary permit owes an investigation fee equal to the permit fee, in addition to the permit fee itself, under Sec. 4.

Violations & Fines

Under Sec. 8-114.4, unpermitted or noncompliant work carries a civil sanction of $400 to $1,000 per violation, capped at $2,000 per day per property, or prosecution as a Class 1 misdemeanor punishable by up to $2,500 and up to six months in City jail; each day a violation continues is a separate offense, and a building erected without a required permit must be brought into conformance or demolished under Sec. 8-114.5.

Frequently Asked Questions

When does Tempe require a building permit?
Sec. 8-105.1 requires a permit before any construction, enlargement, alteration, repair, move, demolition or occupancy change to a building, or before altering its electrical, gas, mechanical or plumbing systems, unless the work falls on the Sec. 8-105.2 exempt list.
What happens if I start work without a Tempe building permit?
Sec. 8-109.4 charges an investigation fee equal to the regular permit fee on top of the permit fee itself, and Sec. 8-114.4 exposes the owner to a civil sanction of $400 to $1,000 per violation or a Class 1 misdemeanor with up to $2,500 in fines and six months in jail.
How long is a Tempe building permit application valid?
An application is valid for one year from filing under Sec. 8-105.3.2, with a single 180-day extension available on written request and payment of a renewal fee equal to 25% (before plan approval) or 10% (after approval, before permit issuance) of the original plan review fee.

Sources & Official References

Other rules in Tempe

All Tempe rules

Compare Tempe to another location·View the Arizona building safety overview

Get notified when Building Permits in Tempe, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Maricopa County handle building permits.

Chandler, AZ
Light Restrictions
Mesa, AZ
Some Restrictions
Gilbert, AZ
Some Restrictions
Glendale, AZ
Some Restrictions
Surprise, AZ
Some Restrictions
Goodyear, AZ
Some Restrictions
Scottsdale, AZ
Some Restrictions
Peoria, AZ
Some Restrictions