Yuma, AZ Building Safety: Building Permits (2026)
Key Facts
- Adopted code
- 2024 International Building Code
- Base permit fee
- $50 for valuation up to $500
- Plan review fee
- 65% of the building permit fee
- Application expires
- 180 days if not pursued
- Unpermitted work fee
- $50 minimum investigation fee
Summary
Yuma enforces the 2024 International Building Code through City Code § 150-015, with local fee and process amendments at § 150-016. Nearly all construction needs a permit; only a narrow list of exempt work, like like-kind window replacements, skips the process.
(D) Section [A] 105.2 Work exempt from permit. Add the following additional item under the heading, "Building:"
14. Window replacements of like size where framing is not altered and any required emergency egress dimensions are not diminished from existing, in Group R-3 one-and two-family dwellings and installed by either a licensed contractor or owner-occupant of the residence.
(E) Section [A] 105.3.2 Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 180 days after the date of filing, unless such application has been pursued in good faith or a permit has been issued; except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 180 days each. The extension shall be requested in writing and justifiable cause shall be demonstrated.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-74: Current through May 20, 2026).
Full Breakdown
The Department of Community Development, Building Safety Division administers permits under the 2024 IBC as locally amended (§ 150-016(B)). The city added one item to the code's work-exempt list: window replacements of like size in one- and two-family Group R-3 homes, where framing and required emergency egress dimensions are unchanged, installed by a licensed contractor or the owner-occupant (§ 150-016(D)). Everything else needing construction, alteration, repair or demolition work still needs a permit application under the adopted IBC. Applications go stale fast: § 150-016(E) deems a permit application abandoned 180 days after filing unless it has been pursued in good faith or a permit issued, though the building official can grant repeated 180-day extensions on written request showing justifiable cause.
Fees follow Table 1-A: $50 for work valued up to $500, scaling to $6,580 for the first $1,000,000 plus $4 for each additional $1,000 (§ 150-016(I)). Plan review costs an added 65 percent of the permit fee (§ 150-016(J)). Refunds are capped at 80 percent of unspent permit or plan review fees and must be requested in writing within 180 days of payment (§ 150-016(L)).
Violations & Fines
Starting work before a permit issues triggers an investigation fee on top of the regular permit fee under § 150-016(K), set by the building official based on the infraction's severity, running from a $50 minimum up to the full Table 1-A fee. Letting an application sit unpursued for 180 days voids it under § 150-016(E), forcing a fresh application and a new plan review fee unless an extension was granted in writing beforehand.
Frequently Asked Questions
Do I need a permit to replace a window in my Yuma home?
How long is my Yuma building permit application good for?
What if I start construction before pulling a permit?
Sources & Official References
Other rules in Yuma
Compare Yuma to another location·View the Arizona building safety overview