Yuma, AZ Building Safety: Green Building Code (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2009 International Energy Conservation Code
Adopting ordinance
Ord. O2013-15, passed 4-3-13
Warehouse exception
S-1, S-2, U occupancies, unconditioned space
Plan review fee
65% of the energy code permit fee
Unpermitted work fee
$50 minimum investigation fee

Summary

Yuma's energy-efficiency standard is the 2009 International Energy Conservation Code, adopted by City Code § 150-020 and locally amended by § 150-021, with a carve-out for unconditioned warehouse and storage space and its own permit and investigation-fee structure.

§ 150-020 Adoption of 2009 International Energy Conservation Code. That certain documents, three copies of which are on file as public record in the office of the City Clerk of the City of Yuma, being marked and titled as the 2009 International Energy Conservation Code, which was made public record by Resolution R2013-09, as amended herein, is hereby adopted by reference and made a part hereof as if fully set out in the entirety herein. ... (B) Section 101.5.2 Low energy buildings. Add third exception to section, as follows: "3. Warehouse and storage portions of buildings in Groups S-l, S-2, and U Occupancies that are not designed as fully conditioned space." ... (F) Section 107.3 Work commencing before permit issuance. Add to end of section, "An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The minimum investigation fee shall be $50.00 and the maximum shall be an amount up to the same as the fee set forth in Table 1-A."

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-74: Current through May 20, 2026).

Full Breakdown

The city adopted the 2009 IECC by Ord. O2013-15 (passed April 3, 2013), made public record as Resolution R2013-09, and enforces it through the Department of Community Development, renaming the code's 'code official' to 'building official' throughout (§ 150-021(C)). 2, Low energy buildings: warehouse and storage portions of buildings in Groups S-1, S-2, and U occupancies that are not designed as fully conditioned space do not have to meet the code's low-energy exemption test the way other buildings do (§ 150-021(B)). Energy code permits use the same Table 1-A valuation-based fee schedule as building permits, from $50 for work valued up to $500 climbing to $6,580 for the first $1,000,000 plus $4 per additional $1,000, and plan review adds 65 percent of the permit fee (§ 150-021(E)).

As with the building and plumbing codes, starting work before a permit issues under § 150-021(F) adds an investigation fee, minimum $50, capped at the full Table 1-A fee, on top of the regular permit fee. Refunds follow the same 80 percent cap on unused permit or plan review fees, requested in writing within 180 days of payment (§ 150-021(G)).

Violations & Fines

Beginning energy-code-covered work, such as insulation, glazing, or mechanical system installations governed by the IECC, before a permit issues triggers the § 150-021(F) investigation fee, a minimum of $50 and up to the full Table 1-A permit fee, assessed by the building official according to the severity of the infraction, in addition to the standard permit fee that is still owed.

Frequently Asked Questions

Does Yuma have a separate green building code?
No. Yuma's energy-efficiency requirements run through the locally amended 2009 International Energy Conservation Code, adopted at City Code § 150-020 and amended at § 150-021, rather than a standalone green building ordinance.
Are warehouses exempt from Yuma's energy code?
Storage and warehouse portions of buildings in Groups S-1, S-2, and U occupancies that aren't designed as fully conditioned space get an added exception under § 150-021(B) to the code's low-energy-building test.
What if I start work covered by the energy code before getting a permit?
You still owe the standard permit fee plus an investigation fee under § 150-021(F), a minimum of $50 up to the full Table 1-A amount, set by the building official based on the circumstances of the violation.

Sources & Official References

Other rules in Yuma

All Yuma rules

Compare Yuma to another location·View the Arizona building safety overview

Get notified when Green Building Code in Yuma, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.