Key Facts
- Governing law
- Abington Township Code § 67-2; § 62-2 (Sec. 112.3.Q)
- Adopted code
- PA Uniform Construction Code, 34 Pa. Code 401-405
- Electrical permit fee
- $15 up to $500, sliding scale higher
- Administering body
- Township self-administers under §67-1
- Penalty
- Up to $1,000 fine per offense (§116.4)
Summary
Abington Township charges a separate electrical permit application fee under Section 112.3(Q), scaled to the price quoted for the electrical work, on top of administering the Pennsylvania Uniform Construction Code under Chapter 67, which incorporates the International Codes into the Township's building requirements.
§ 67-2. Adoption and incorporation by reference. The Uniform Construction Code, contained in 34 Pa. Code, Chapters 401 through 405, as amended from time to time, is hereby adopted and incorporated herein by reference as the municipal building code of the Township, and this includes each of the various International Codes incorporated into the code Act. ... Section 112.3.Q. Electrical Permit. An application fee shall be paid at the time of submission of an application for an electrical permit and shall be calculated based on the price quoted to perform the electrical work as follows: Up to $500: $15 From $501 to $1,000: $30 From $1,001 to $1,500: $45 From $1,501 to $2,000: $60 For each $1,000 or fraction thereof over $2,000: $15
Full Breakdown
Section 67-2 of the Abington Township Code adopts and incorporates by reference "the Uniform Construction Code, contained in 34 Pa. Code, Chapters 401 through 405, as amended from time to time," as the municipal building code of the Township, and the section states that this "includes each of the various International Codes incorporated into the code Act," the mechanism through which the National Electrical Code reaches electrical work in Abington. Section 67-1 confirms the Township elected to administer the Pennsylvania Construction Code Act itself, Act 45 of 1999, 35 P.S.
Sections 7210.101 through 7210.1103, rather than defer to the state Department of Labor and Industry, and Section 67-3 lets the Township carry out that administration through its own code official, a retained third-party agency, or an intermunicipal agreement. Section 112.3(Q), added to Chapter 62 by Section 62-2(E), sets the electrical permit application fee on a sliding scale tied to the price quoted to perform the work: $15 for jobs up to $500, $30 from $501 to $1,000, $45 from $1,001 to $1,500, $60 from $1,501 to $2,000, and $15 for each additional $1,000 or fraction above $2,000.
That fee is charged separately from HVAC, plumbing and building permit fees in the same schedule, so an electrical upgrade tied to a larger renovation draws its own permit and its own line-item cost alongside the rest of the project's permits.
Violations & Fines
Electrical work done without the permit required by Section 112.3(Q), or in violation of an approved plan, falls under the same Section 116.4 penalty as the rest of the adopted building code: fines and penalties up to $1,000 per offense, plus a reinspection fee equal to the original permit fee, with each day of continued noncompliance a separate offense.
Frequently Asked Questions
Does Abington Township require a separate electrical permit?
What electrical code applies in Abington Township?
How much does an electrical permit cost for a $1,200 job?
Who administers electrical inspections, the Township or the state?
Sources & Official References
Other rules in Abington
Compare Abington to another location·View the Pennsylvania building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Montgomery County handle electrical permits.