Key Facts
- Adopted code
- State minimum standard codes incl. NEC
- Governing section
- Bulloch County Code § 4-26
- Electrical inspection
- Sec. 4-52(a)(10), permanent power
- Contractor requirement
- State electrical license shown to official
- Maximum penalty
- $1,000 fine, 60 days jail (Sec. 1-11)
Summary
Bulloch County enforces Georgia's state minimum standard codes, which include the National Electric Code, under Sec. 4-26. Electrical work in the unincorporated area needs a permit before it starts, and the building official will not sign off on permanent power until the National Electric Code inspection under Sec. 4-52(a)(10) passes.
Bulloch County shall enforce the "state minimum standard codes" as defined in Section 8-2-20(9)(B)(i)(I)-(VIII) and as authorized by Section 8-2-25(a) of the Official Code of Georgia Annotated as well as the current International Existing Building Code. ... (10)Permanent power inspection: Inspection shall be made to determine compliance with the National Electric Code. Upon compliance with the National Electric Code, the building department will fax to the appropriate power company an approval to connect power to the building.
Full Breakdown
A. Section 8-2-20(9)(B)(i)(I)-(VIII) and authorized by Section 8-2-25(a), the group of eight codes the state requires every Georgia jurisdiction to adopt, which includes the National Electric Code. Sec. 4-27 further provides that where the county's own ordinances conflict with those state minimum standard codes, the state codes prevail, and Sec. 4-28 assigns the duties of any named state-code official to the corresponding county official, meaning the county building official administers electrical enforcement locally. That enforcement happens through the inspection sequence in Sec. 4-52: subsection (a)(10), the permanent power inspection, is made specifically 'to determine compliance with the National Electric Code,' and only after that compliance is confirmed does the building department fax the appropriate power company an approval to connect permanent power to the structure.
Electrical work is swept into the general permit requirement of Sec. 4-50(a)(1), which requires an owner or contractor to apply to the building official and obtain a permit before installing, altering or replacing an electrical system regulated by the International Residential Code. Contractors performing that work must present a valid state electrical license to the building official before the permit issues, under Sec. 4-50(c)(5), and register that license number with the building official per Sec. 4-51(c)(2) before any permit is pulled.
Violations & Fines
Electrical work performed without a permit, or that fails the National Electric Code compliance check in Sec. 4-52(a)(10), is a violation of Chapter 4's technical codes division. Sec. 4-54(a) authorizes the building official to issue a stop-work order, and Sec. 4-54(b)(1) subjects the violator to the general penalty of Sec. 1-11: up to a $1,000.00 fine, up to 60 days in jail, or both, with permanent power withheld until compliance is verified.
Frequently Asked Questions
What electrical code does Bulloch County use?
When does the county check my electrical work against the NEC?
Do I need a license to pull an electrical permit in Bulloch County?
What happens if electrical work fails the NEC inspection?
Sources & Official References
Other rules in Bulloch County
Compare Bulloch County to another location·View the Georgia building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.