Key Facts
- Adopted code
- 2025 CEC, incorporates 2023 NEC
- Current amendment
- Ord. 25-12, eff. Dec. 31, 2025
- Who may permit
- Owner-occupants, licensed contractors, agencies
- Plan review fee
- 25% of permit fee, Table E-1
- Permit expires
- 180 days without work commenced
- Unpermitted work penalty
- Investigation fee up to 10x permit fee
Summary
Clovis enforces the 2025 California Electrical Code, incorporating the 2023 National Electrical Code, under Municipal Code Section 8.2.101. Permits go only to licensed electrical contractors, government agencies, licensed general or specialty contractors, or owners doing work on their own occupied single-family home.
For the purpose of regulating electrical systems, the 2025 California Electrical Code (CEC) promulgated by the California Building Standards Commission, which incorporates the adoption of the 2023 edition of the National Electrical Code, is hereby adopted by reference thereto as if fully set forth in this Chapter, save and except such portions as are deleted, modified, or amended by the provisions of this Chapter... If any conflicts between this Code and any other City, State, or Federal Code should arise, the most restrictive Code providing the highest level of safety, as determined by the Building Official, shall prevail. ... Permits shall be issued only to: (1) Owners of single-family dwellings provided the work for which the permit is sought is to be on a dwelling to be occupied by the permittee. (2) Electrical contractors holding a valid State Electrical Contractor's license; (3) Governmental agencies; (4) State licensed general or specialty contractors within the scope of their licenses.
Full Breakdown
2, with the most recent edition of Ord. 25-12 effective December 31, 2025. Where the CEC conflicts with any other city, state, or federal code, the Building Official applies whichever provision gives the highest level of safety. 102(a) limits who may pull an electrical permit: owner-occupants working on their own single-family dwelling, state-licensed electrical contractors, government agencies, and licensed general or specialty contractors acting within their license scope; certified plant electricians may also secure permits for plant maintenance under annual authorization from plant management. 102(b) defines dangerous electrical equipment subject to mandatory replacement or repair, including panels showing evidence of repeated overloads, insufficient clearance in front of a service panel, exposed live-front panels, fuses rated above CEC limits, conductors run in unapproved raceways, mixed-class conductors sharing a raceway, appliance drop cords longer than six feet, and equipment that is improperly grounded, broken, or unsafe for its intended use.
102(c), the Building Official issues a written order to remove or replace a violating installation, and in cases of extreme danger to life or property may immediately physically disconnect the installation without further notice. 1, before reconnecting service to any residential, commercial, or industrial building that has been disconnected for 90 or more continuous days. 1(d), the plan review fee for electrical work equals 25 percent of the total permit fee shown in Table E-1. 1(b) voids a permit if work has not started within 180 days or is suspended for 180 days, with re-activation costing half the original fee if plans are unchanged and the lapse is under a year.
Violations & Fines
Working without a permit triggers an investigation fee under Section 8.1.01.1(e) equal to the permit fee, collected whether or not a permit is later issued; a repeat violation by the same permittee escalates the investigation fee to three times the permit fee, then four, five, and up to a maximum of ten times the permit fee for further violations. Dangerous equipment found under Section 8.2.102(b) can be ordered removed, repaired, or disconnected by the Building Official, with immediate physical disconnection authorized where the danger to life or property is extreme.
Frequently Asked Questions
Who can pull an electrical permit in Clovis?
What electrical code does Clovis currently enforce?
What happens if I skip the permit for electrical work?
Can the city disconnect my electrical service for violations?
Sources & Official References
Other rules in Clovis
California rules heatmap·Compare Clovis to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Fresno County handle electrical permits.