Coconut Creek, FL Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum electrical fee
$75.00 for all permits, unless noted
New service or service change
$150.00
Fire alarm
$200.00
Multifamily premise permit
$500.00, with yearly log and as-builts
30-day temporary electric
$150.00, one $300.00 renewal
Site lighting
$50.00 per pole

Summary

In the City of Coconut Creek, Florida, section 13-85 sets a $75.00 minimum electrical permit fee, $150.00 for a new service or service change, $200.00 for fire alarms and $500.00 for a multifamily premise permit. A 30-day temporary electric permit costs $150.00 and one renewal costs $300.00.

Fees for electrical permits, not covered under section 13-84, shall be as follows: ... (1)Minimum fee for all permits, except as otherwise noted: $75.00(2)Each low voltage system: $100.00(3)Demolition: $100.00(4)Firealarm: $200.00(5)Re-roof A/C disconnects, per disconnect: $20.00(6)Site lighting/parking lot lighting, per pole: $50.00(7)Premise permit - multifamily - yearly maintenance log and as-builts required: $500.00(8)Service change/service repair/new service: $150.00(9)30-day temporary electric: $150.00 ... Renewal if CO is not issued within 30-days (1 time only): $300.00 ... If CO is not issued within 30 days after renewal-power will be disconnected ... (10)Fire repair: $100.00

Full Breakdown

Section 13-85 of the Coconut Creek Code prices electrical permits that are not already covered by section 13-84. The minimum fee for all permits, except as otherwise noted, is $75.00. Each low voltage system is $100.00, demolition is $100.00, and a fire alarm is $200.00. Re-roof A/C disconnects are $20.00 per disconnect, and site or parking lot lighting is $50.00 per pole. A service change, service repair or new service is $150.00. A multifamily premise permit, which requires a yearly maintenance log and as-builts, is $500.00. Fire repair work is $100.00.

Temporary power carries a deadline. A 30-day temporary electric permit costs $150.00. If a certificate of occupancy is not issued within 30 days, the permit can be renewed one time only for $300.00, and if the certificate of occupancy is still not issued within 30 days after renewal, power will be disconnected.

Some electrical work is priced elsewhere. Section 13-84 charges $700.00 for swimming pools and spas, a figure that includes structural, electrical and plumbing work, and $500.00 for mobile homes and construction or sales trailers, which includes structural, electrical, plumbing and mechanical work. Section 13-86 notes that tankless water heaters require a separate electrical permit. Under section 13-84, fees are non-refundable and cannot be applied to any permit application other than the one for which they were paid.

Section 13-85 is a fee schedule. It does not itself name an electrical code edition. The permitting requirement comes from section 13-38, which requires a permit for construction, addition, alteration, repair or change of use of any building, structure or land. Applications are accepted only from the property owner or a licensed, bonded contractor representing the owner and are reviewed by the department of sustainable development. Section 13-38(d)(1) bars issuance except when the work conforms to the Florida Building Code and the chapter, and a permit expires if construction does not commence within 180 days of issuance.

Violations & Fines

Work requiring a permit without one falls under section 13-38, where any person found in violation of the chapter is punished pursuant to section 1-8 and each day a violation is committed or permitted to continue is a separate offense. Under section 13-85, temporary power is disconnected if a certificate of occupancy is not issued within 30 days after the one permitted renewal.

Frequently Asked Questions

How much is an electrical permit in the City of Coconut Creek?
Section 13-85 sets a $75.00 minimum for all permits except as otherwise noted. A service change, service repair or new service is $150.00, a fire alarm is $200.00, each low voltage system is $100.00, and site or parking lot lighting is $50.00 per pole.
What happens if my temporary electric permit runs out?
A 30-day temporary electric permit costs $150.00. If a certificate of occupancy has not been issued within 30 days, it can be renewed one time only for $300.00. If the certificate is still not issued within 30 days after renewal, section 13-85 provides that power will be disconnected.
Do I need a separate electrical permit for a tankless water heater?
Yes. The note in section 13-86 states that tankless water heaters require a separate electrical permit. The plumbing side of a water heater replacement is a separate $65.00 fee under that section, so the job involves two permits.
Does Coconut Creek's fee section name the electrical code it enforces?
No. Section 13-85 only lists fees. Section 13-38 governs when permits are needed and requires applications to contain the information the director of sustainable development requires under the Florida Building Code. It also bars issuing permits except in conformance with that code.

Sources & Official References

Other rules in Coconut Creek

All Coconut Creek rules

Florida rules heatmap·Compare Coconut Creek to another location·View the Florida building safety overview

Get notified when Electrical Permits in Coconut Creek, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.