Colorado Springs, CO Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted building code
Pikes Peak Regional Building Code, 2023 Ed.
Electric code source
National Electric Code, via RBC adoption
Permit trigger
Any work requiring RBC105.1 permit
Regulatory ranking
Below City ordinances and Utilities' tariffs
General penalty (Sec. 1.1.201)
Up to $2,500 fine / 189 days jail

Summary

Colorado Springs requires a building permit before any electrical work covered by the Regional Building Code, and Council has formally adopted the Pikes Peak Regional Building Code, 2023 Edition, including the National Electric Code referenced within it, as the governing standard for electric installations citywide.

7.4.1404: CODE ADOPTED BY REFERENCE: A. There is hereby adopted by reference the Pikes Peak Regional Building Code, 2023 Edition... as amended, including all referenced and adopted codes listed in that document. Three (3) copies of the Pikes Peak Regional Building Code, 2023 Edition are now filed in the Office of the City Clerk... 12.2.202: PRIORITY OF REGULATIONS: A. The use or connection to the electric supply system of the City by any person shall be subject to... 4. Applicable provisions of the National Electric Code as adopted by Council in the Regional Building Code. 7.5.503.B.1: It shall be unlawful to perform any work for which a building permit is required under Section RBC105.1 of the Regional Building Code without first obtaining a building permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-21: Code current through: Ord. 26-23, passed June 9, 2026).

Full Breakdown

Two parts of the City Code work together here. as amended, including all referenced and adopted codes listed in that document," with three copies on file at the Office of the City Clerk for inspection. 4, in the Electric Code's Priority of Regulations, confirms that any connection to the City's electric supply system is subject to "Applicable provisions of the National Electric Code as adopted by Council in the Regional Building Code," ranking it below only City ordinances and Utilities' own tariff sheets and safety code in the regulatory hierarchy.

1 of the Regional Building Code without first obtaining a building permit": a requirement that reaches electrical work performed as part of any covered project. C may approve them only once they comply with all applicable requirements, and no permit issues until utility and subdivision fees are paid. A Certificate of Occupancy likewise won't issue until the structure meets the Regional Building Code, including Section RBC110. Because the National Electric Code arrives in Colorado Springs through the Regional Building Code rather than as a stand-alone city chapter, the practical authority for electrical wiring, service, and inspection standards runs through the Pikes Peak Regional Building Department, the same office that files and administers the adopted 2023 Regional Building Code for the city.

Violations & Fines

Performing electrical work without the required RBC105.1 permit is unlawful under Section 7.5.503.B.1, and occupying a structure before its Certificate of Occupancy issues is separately unlawful under the same section. Absent a more specific penalty, violations fall under the City Code's general penalty, Section 1.1.201: conviction carries a fine up to $2,500, jail up to 189 days, probation, or a combination.

Frequently Asked Questions

Does Colorado Springs have its own electrical code separate from the building code?
No. Section 12.2.202.A.4 ties electrical work to "the National Electric Code as adopted by Council in the Regional Building Code," so the applicable wiring standard comes in through the Pikes Peak Regional Building Code rather than a standalone city electrical chapter.
Who administers electrical permits in Colorado Springs?
The Building Official reviews and approves building permit applications, including electrical work, per Section 7.5.503.C, working from the 2023 Pikes Peak Regional Building Code that City Council adopted by reference in Section 7.4.1404.A.
Is it legal to do electrical work in Colorado Springs without a permit?
No. Section 7.5.503.B.1 states it is unlawful to perform any work requiring a permit under RBC105.1 of the Regional Building Code without first obtaining one, and occupying the space before a Certificate of Occupancy issues is separately unlawful.
Where is the adopted Regional Building Code available to review?
Section 7.4.1404.A states that three copies of the Pikes Peak Regional Building Code, 2023 Edition, are filed in the Office of the City Clerk and may be inspected during regular business hours.

Sources & Official References

Other rules in Colorado Springs

All Colorado Springs rules

Compare Colorado Springs to another location·View the Colorado building safety overview

Get notified when Electrical Permits in Colorado Springs, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.