Summary
The City of Milton requires a permit from the building inspector before any electric wiring or equipment is installed or altered, and all work must conform to the state electrical code. Only minor socket, switch or receptacle repairs are exempt.
No electric wiring or other equipment shall be installed or altered without first securing a permit therefor from the building inspector, except that repairs or replacements of broken or defective sockets, switches or base receptacles may be made without a permit. The application for such permit shall be on a form furnished by the building inspector and shall state clearly the work planned, alterations to be made, and equipment and materials to be used and all later deviations from such plan must be submitted to and approved by the building inspector.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 21 Update 2).
Full Breakdown
Milton Code of Ordinances Sec. 10-212 bars installing or altering electric wiring or other equipment without first securing a permit from the building inspector, with a narrow exception for repairs or replacements of broken or defective sockets, switches or base receptacles. The permit application must be on a city form stating clearly the work planned, the alterations to be made, and the equipment and materials to be used; any later deviation from that plan must go back to the building inspector for approval. Sec. 10-211 ties all electrical work, including wiring and other equipment placement, to Wis.
Admin. Code ch. SPS 316, the state electrical code adopted by the Wisconsin Department of Safety and Professional Services, plus all amendments and revisions, which the city adopts by reference under Ord. No. 464, § I, effective June 4, 2019. Inspection follows a two-stage process under Sec. 10-213: after roughing in wiring, and before the work is covered, the person doing the work must notify the building inspector, who inspects within 48 hours excluding weekends and holidays. Upon completion, the inspector again inspects and, finding the work conforms to the National Electrical Code and state electrical code, posts notice of compliance at the job site; for new or temporary services, the inspector issues a certificate of inspection to the utility company.
Cited violations must be corrected within 30 days of written notification, and no person may enclose or use wiring or equipment until it has been inspected and approved. Sec. 10-214 sets permit fees by council resolution, and Sec. 10-215 clarifies the city assumes no liability for defects merely by inspecting or certifying work.
Violations & Fines
Installing or altering wiring without the Sec. 10-212 permit, or using uninspected wiring, is a Code violation enforced by the building inspector, who can require correction of cited defects within 30 days. General violations of the Code carry the Sec. 1-14 penalty: $50.00 to $500.00 forfeiture for a first offense and $100.00 to $1,000.00 for a repeat offense, plus prosecution costs.
Frequently Asked Questions
Do I need a permit for electrical work in Milton, WI?
What electrical code does the City of Milton follow?
How long do I have to fix a failed electrical inspection in Milton?
Sources & Official References
Other rules in Milton
Compare Milton to another location·View the Wisconsin building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Rock County handle electrical permits.