New Rochelle, NY Building Safety: Electrical Permits (2026)
Key Facts
- Permit requirement
- § 111-8, Building Official approval before work
- Certificate requirement
- § 111-3B, wiring unlawful until certified
- New/increased service fee
- $100
- New 1-2 family dwelling fee
- $120
- New commercial building fee
- $250 (first 20 outlets)
- First offense penalty
- Up to $2,500
Summary
New Rochelle requires a permit from the Building Official before starting electrical work that must conform to the State Code, under City Code § 111-8. Fees for electrical permits are set separately in Chapter 133 and range from $100 for a basic service upgrade to $250 for a new commercial building's first 20 outlets.
No person, firm or corporation shall commence the erection, construction, enlargement, alteration, removal, improvement, demolition, excavation or conversion of any building or structure or part thereof, or change the occupancy or use of any building or structure or part thereof, or perform any work which must conform to the State Code, or cause the same to be done, or shall erect any crane on private property, without first filing with the Building Official an application and obtaining a permit therefor, except as otherwise exempted under the provisions of this code.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4601407; v60 updated 2025-12-02; through 12-02-2025).
Full Breakdown
Section 111-8, Building permit required, states the general rule the City applies to electrical work: no person, firm or corporation may commence alteration, installation or any work that must conform to the State Code without first filing an application with the Building Official and obtaining a permit, except where the code specifically exempts the work. Section 111-3B reinforces this for electrical systems in particular, making it unlawful to use electric wiring or any other equipment controlled by the code until the Building Official has issued the proper certificate.
Electrical permits are issued by the Bureau of Buildings, and § 111-42C(5) directs that their fee follows the schedule in Chapter 133, Fees. That schedule, last amended December 13, 2016 by Ordinance No. 250-2016, sets the electrical permit fee at $100 for a new or increased electrical service, $120 for a new one- or two-family dwelling, $250 for the first unit of a new multifamily dwelling plus $100 for each additional unit, $250 for a new commercial building's first 20 outlets or fixtures plus $5 for each outlet or fixture above 20, and $100 for alterations covering up to 20 outlets.
Resolution 147-2008 separately waived electrical permit fees for power-factor technology work funded through the NYSERDA program. Under § 111-9C, the Building Official may waive the permit requirement at his discretion for minor alterations costing less than $10,000, but only if electrical, plumbing and heating systems are not affected.
Violations & Fines
Doing electrical work without the required permit or certificate is enforced under Chapter 111's general penalty section, § 111-40. The Building Official serves a notice of violation ordering the work stopped; unresolved violations go to the Corporation Counsel, and the property owner, contractor or anyone who took part faces a fine of up to $2,500 for a first offense and up to $5,000 for a repeat offense within three years, plus up to 15 days in jail, with each day counted separately.
Frequently Asked Questions
Do I need a permit for electrical work in New Rochelle?
How much does an electrical permit cost in New Rochelle?
Can the City waive the electrical permit for small jobs?
Sources & Official References
Other rules in New Rochelle
New York rules heatmap·Compare New Rochelle to another location·View the New York building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.