Key Facts

Governing code
NYStretch Energy Code - 2020, enforced under § 111-5
Enforcing official
Building Official, Bureau of Buildings
Adopted
By amendment 4-20-2021, Ord. No. 2021-48
Inspection required
Energy code inspection during and after construction
Certificate hold
No occupancy certificate without passed inspection

Summary

New Rochelle enforces the NYStretch Energy Code as part of its Building Code, administered by the Building Official who heads the Bureau of Buildings. Adopted by amendment in 2021, NYStretch sets more efficient insulation, air-sealing and mechanical-system standards than the base New York State Energy Conservation Construction Code for new construction and major renovations, and every project undergoes a mandatory energy code inspection before a certificate of occupancy issues.

The head of the Bureau of Buildings, Department of Development, City of New Rochelle, New York, shall be the Building Official, and he shall act as the code enforcement official for those provisions of the State Code as relate to the construction and repair of structures, which shall include the NYStretch Energy Code – 2020 (NYStretch).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4601407; v60 updated 2025-12-02; through 12-02-2025).

Full Breakdown

" In 2021 the Council amended Section 111-5 to designate the head of the Bureau of Buildings, Department of Development, as the Building Official responsible for enforcing those provisions of the State Code that relate to construction and repair, expressly including the NYStretch Energy Code - 2020. NYStretch layers tighter envelope, lighting and HVAC efficiency requirements on top of the base state Energy Conservation Construction Code; by folding it into the Building Official's enforcement mandate, New Rochelle applies those tighter standards to permitted work citywide rather than leaving them optional.

Compliance is checked at the permit-review stage, when plans must demonstrate conformance with the State Code, and again on site: Section 111-18A(5) requires that all structures, additions and new equipment requiring compliance with the New York State Energy Conservation Code be inspected and approved during the course of construction and upon completion. A project cannot obtain its certificate of occupancy under Section 111-16 until that energy code inspection, along with every other required inspection, has been signed off by the Building Official. There is no separate green-building permit or fee schedule; NYStretch compliance rides on the same building permit application, plans and inspection process used for every other trade covered by Chapter 111.

Violations & Fines

Work that fails an energy code inspection cannot be covered or concealed and cannot receive a certificate of occupancy or compliance under Sections 111-16 and 111-18 until it is corrected and re-inspected. Proceeding without the required energy code sign-off exposes the permit holder to the Building Official's general enforcement powers under Section 111-6, including stop-work action, and continued occupancy or use in violation of the code is itself a violation under Section 111-3.

Frequently Asked Questions

Does New Rochelle require compliance with the NYStretch Energy Code?
Yes. Section 111-5 of the Building Code designates the Building Official as the enforcement officer for State Code provisions on construction and repair, and expressly states that authority includes the NYStretch Energy Code - 2020. Permitted construction, alteration or new equipment covered by Chapter 111 must meet NYStretch's efficiency standards, not just the base state energy code.
Who checks NYStretch compliance on a project?
The Building Official and Bureau of Buildings inspectors handle it. Section 111-18A(5) requires an energy code inspection during construction and again upon completion for all structures, additions and new equipment subject to the New York State Energy Conservation Code, which now incorporates NYStretch obligations under Section 111-5.
Can I get a certificate of occupancy before the energy inspection passes?
No. Section 111-18A(7) bars issuance of a certificate of occupancy or compliance until all required inspections, including the energy code inspection, are performed and approved, so incomplete or failed energy work will hold up final sign-off on the whole project.

Sources & Official References

Other rules in New Rochelle

All New Rochelle rules

New York rules heatmap·Compare New Rochelle to another location·View the New York building safety overview

Get notified when Green Building Code in New Rochelle, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Green Building Code in Nearby Cities

How other cities in Westchester County handle green building code.

Yonkers, NY
Some Restrictions
Mount Vernon, NY
Some Restrictions