Key Facts

Adopted code
NEC 2023 Edition, NFPA
Local amendments
Southern Nevada Amendments to 2023 NEC
Governing section
NLVMC § 15.12.010
Latest re-adoption
Ord. No. 3236, 7-2-2025
Filed with
Office of the City Clerk

Summary

North Las Vegas requires electrical work to comply with the 2023 National Electrical Code as locally amended. City Code § 15.12.010 adopts the NEC by reference, together with the Southern Nevada Amendments, making it the baseline every electrical permit application must meet.

That certain document, one of which is on file in the office of the city clerk of the City of North Las Vegas, Nevada, which is marked and designated as "National Electrical Code, 2023 Edition" published by the National Fire Protection Association, together with all tables of contents, definitions, sections, tables, indexes, examples, and appendices, is hereby adopted by reference and made a part of this chapter, the same as if it was fully set forth herein, except as amended by the "Southern Nevada Amendments to the 2023 National Electrical Code" as amended by the City of North Las Vegas.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 146 Update 1).

Full Breakdown

12 of the North Las Vegas Municipal Code adopts the National Electrical Code wholesale. 010 states that the document "marked and designated as 'National Electrical Code, 2023 Edition' published by the National Fire Protection Association, together with all tables of contents, definitions, sections, tables, indexes, examples, and appendices, is hereby adopted by reference and made a part of this chapter, the same as if it was fully set forth herein," except as modified by the city's own Southern Nevada Amendments. A copy of both documents is kept on file with the city clerk for public inspection, and the ordinance history shows the chapter has been re-adopted with each new NEC cycle (Ord.

No. 2658 in 2014, Ord. No. 2911 in 2018, and most recently Ord. No. 3236 on 7-2-2025, which rolled the city onto the 2023 edition). Because the NEC is adopted by reference rather than rewritten, contractors and homeowners pulling a permit through the city's Building Safety Division are held to the national code's wiring, grounding, service-panel, and inspection requirements, layered with whatever the Southern Nevada Amendments change locally. Permit applications, plan review, and inspections for new construction, service upgrades, and most repair work run through the same Title 15 building-permit process as mechanical and plumbing work.

Work performed without a permit, or that fails to meet the adopted code, can be red-tagged by the building official until it is brought into compliance, and re-inspection or correction typically requires a new or amended permit application before power is released to the affected circuits.

Violations & Fines

Electrical work performed without a permit or that fails inspection under the adopted 2023 NEC and Southern Nevada Amendments can be stopped by the building official, who may red-tag the installation and require correction before utility service is authorized. Because Chapter 15.12 is part of Title 15's uniform adoption scheme, general Title 15 penalty provisions for code violations apply, and repeat or unpermitted work can trigger separate permit and re-inspection fees.

Frequently Asked Questions

What electrical code does North Las Vegas use?
The city adopts the 2023 National Electrical Code by reference under § 15.12.010, modified by its own Southern Nevada Amendments. Both documents are kept on file with the city clerk and govern every electrical permit issued by the Building Safety Division.
Do I need a permit for electrical work in North Las Vegas?
Yes. Electrical installations fall under Title 15's adopted-code permit structure, and work must meet the 2023 NEC as locally amended before the building official will approve it and release inspection sign-off.
How often does North Las Vegas update its electrical code?
The city has re-adopted Chapter 15.12 with each recent NEC cycle, most recently updating to the 2023 edition through Ord. No. 3236 on July 2, 2025, following earlier updates in 2018 and 2014.

Sources & Official References

Other rules in North Las Vegas

All North Las Vegas rules

Compare North Las Vegas to another location·View the Nevada building safety overview

Get notified when Electrical Permits in North Las Vegas, NV changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.