San Clemente, CA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2025 California Electrical Code / 2023 NEC
- Filed at
- City's Building Division office
- Undergrounding trigger
- New or relocated main building on the lot
- Hardship relief
- Building Official may delay with recorded agreement/security
- Administrative rules
- Shared with amended Building Code, Chapter 1
Summary
San Clemente enforces the 2025 California Electrical Code, based on the 2023 National Electrical Code, as its local electrical regulations under Municipal Code Section 15.12.010. New or relocated main buildings must also run utility services underground rather than overhead, per Section 15.12.020.
The City Council of the City of San Clemente hereby adopts by reference California Code of Regulations Title 24, Part 3, known and designated as the California Electrical Code, 2025 Edition based on the National Electrical Code (NEC), 2023 Edition, as published by the National Fire Protection Association with the modifications set forth below for the purpose of prescribing regulations for the installation, arrangement, alteration, repairing, replacement, remodeling, or use and other operation of electrical wiring, connections, fixtures and other electrical appliances on premises within the City. The provisions of this code shall constitute the electrical code regulations of the City. The California Electrical Code is on file for public examination in the City's Building Division office. ... (L)Underground utilities required. Overhead wiring shall not be installed outside on private property. The building official, as a condition precedent to the issuance of a building permit, shall require all utility services located within any lot to be installed underground if:(a)The property is to be developed with a new or relocated main building
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Traffic: Supplement 30 | Code of Ordinances: Supplement 66 Update 1).
Full Breakdown
Section 15.12.010 adopts by reference California Code of Regulations Title 24, Part 3, the California Electrical Code, 2025 Edition, itself based on the National Electrical Code (NEC), 2023 Edition as published by the National Fire Protection Association, as San Clemente's governing electrical code for the installation, alteration, repair, replacement, remodeling and use of electrical wiring, connections, fixtures and appliances anywhere in the City. A copy is kept on file for public examination at the Building Division office, and the section has been repeatedly re-adopted with each new state code cycle, most recently by Ordinance No. 1796 on November 4, 2025.
Section 15.12.020 layers city-specific amendments onto that adopted code. It folds in the administrative and fee provisions from Division II of Chapter 1 of the amended Building and Residential Codes, so the same permit-application, plan-review, expiration and reinspection-fee rules that govern building permits also govern electrical permits. It also adds a new Subdivision (L) to NEC Article 300 requiring underground utilities: whenever a property is developed with a new or relocated main building, defined as the building housing the lot's principal use, the Building Official must require all utility services on the lot to be installed underground as a condition of the building permit, with the owner or developer responsible for providing the facilities needed to receive underground service. The Building Official can modify or delay that requirement if it would cause extraordinary hardship, potentially requiring a recorded agreement and financial security guaranteeing the work gets done later. Surface features like transformers, pedestal terminal boxes, meter cabinets and concealed underground ducts are still allowed above ground even where undergrounding applies.
Violations & Fines
Electrical work performed without the required permit, or that does not conform to the adopted 2025 California Electrical Code as amended, is subject to the same administrative penalties, correction notices and reinspection fees that apply to Building Code violations under Chapter 1 and Section 15.04.050, since Section 15.12.020 expressly imports those administrative provisions into the Electrical Code.
Frequently Asked Questions
What electrical code does San Clemente enforce?
Do I have to run new utility lines underground in San Clemente?
What permit rules apply to electrical work?
Sources & Official References
Other rules in San Clemente
California rules heatmap·Compare San Clemente to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Orange County handle electrical permits.