Upland, CA Building Safety: Electrical Permits (2026)
Key Facts
- Code adopted
- 2022 California Electrical Code, in full
- Adoption section
- Upland Municipal Code § 15.28.010
- License required
- Valid CA Contractor's License, § 15.04.070
- Owner-builder exception
- Group R-3 or Group U with approval
- Fees
- Set by City Council resolution, § 15.04.080
- Max misdemeanor penalty
- $1,000 fine and/or 6 months jail
Summary
Upland enforces the 2022 California Electrical Code, adopted in full as the city's electrical construction standard under Municipal Code § 15.28.010. The Building Division issues permits, requires a valid California Contractor's License to pull one, and sets fees by City Council resolution. Doing electrical work without a permit or license is a misdemeanor under the city's general penalty section.
Chapter 15.28. CALIFORNIA ELECTRICAL CODE § 15.28.010. Part 3—California Electrical Code. The 2022 California Electrical Code is adopted by reference, in its entirety, as the city of Upland electrical construction standards. (Ord. 1882 § 9, 2014; Ord. 1935 § 2, 2020; Ord. 1973 § 10, 2023)
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4480959; v4 updated 2025-09-22).
Full Breakdown
Chapter 15.28 of the Upland Municipal Code adopts the 2022 California Electrical Code by reference, in its entirety, as the city's electrical construction standard (§ 15.28.010, amended by Ord. 1973 § 10 in 2023 and originally adopted by Ord. 1882 § 9 in 2014). It is enforced alongside the city's other adopted California Building Standards Code parts under Chapter 15.04, the California Administrative Code, which sets the permitting rules that apply to electrical work.
Under § 15.04.070, no permit may be issued until the applicant presents a valid California Contractor's License of the correct classification to the Building Official. The only exception is an owner-builder permit, which the Building Official may approve for a Group R, Division 3 occupancy (a single-family home) or a Group U occupancy. Section 15.04.050 exempts a short list of minor work from any building permit at all, such as low fences, small retaining walls, and utility-owned installations, but routine dwelling and commercial electrical work requires a permit.
Fees for plan review and permits are set by City Council resolution under the adopted fee schedule (§ 15.04.080), and the Building Official may refund up to 80% of an unused permit or plan review fee on a written application filed within 180 days of payment (§ 15.04.090). Electronic copies of final approved plans must be submitted to the Building Division before final inspection (§ 15.04.110).
Violations & Fines
Working without an electrical permit or without a valid Contractor's License violates Upland Municipal Code § 15.04.070 and Chapter 15.28. The city's general penalty section, § 1.16.010, makes any code violation a misdemeanor punishable by a fine up to $1,000, up to six months in county jail, or both; the city attorney may instead charge it as an infraction under § 1.16.020, with fines of $100, $200, and $500 for successive violations within a year.
Frequently Asked Questions
What electrical code does the city of Upland enforce?
Do I need a licensed contractor to get an electrical permit?
What happens if I do electrical work without a permit in Upland?
Sources & Official References
Other rules in Upland
California rules heatmap·Compare Upland to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.