Broomfield, CO Building Safety: Building Inspections (2026)
Key Facts
- Required inspection stages
- 16 numbered stages
- Advance notice needed
- At least 1 working day
- Concealment
- Barred until stage approved
- Final inspection
- After all permitted work done
- First failed inspection
- No reinspection fee
- Repeat failures
- Fee under Table 1-A
Summary
Broomfield's building official runs sixteen numbered inspection stages on permitted work, from footing and foundation through final inspection. Inspection requests must be filed at least one working day ahead, and work cannot proceed past an inspected stage without the building official's approval.
(C)Required inspections. The building official, upon notification, shall make the inspections set forth in subsections (1) through (16) below.(1)Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. ... (5)Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fireblocking, and bracing are in place and pipes, chimneys, and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes, and ducts are approved. ... (13)Final inspection. The final inspection shall be made after all work required by the building permit is completed.
Full Breakdown
Section 15-03-110(C), B.M.C. requires the building official to make the inspections listed in subsections (1) through (16) once notified that work is ready. Footing and foundation inspections happen after footing excavation is complete and any required reinforcing steel is placed. Concrete slab and under-floor inspections follow, then, in flood hazard areas, a lowest floor elevation inspection. Rough plumbing, mechanical, gas and electrical inspections occur after framing, fireblocking and bracing are in place but before concealment; for single-family homes these are combined with the framing inspection itself, which requires the roof deck, framing, and rough electrical, plumbing and heating systems approved first.
Lath and gypsum board, fire-resistance-rated construction, fire and smoke penetrations, energy-efficiency, and floodplain inspections follow as applicable, along with any other inspection the building official deems necessary. The final inspection is made 'after all work required by the building permit is completed' (15-03-110(C)(13)). Permit holders must request inspections at least one working day before the desired date (15-03-110(I)), post an inspection record card on site (15-03-110(K)), and may not cover or conceal work beyond an inspected stage without the building official's written approval (15-03-110(J)). The Division of Building Safety and Inspection Services, headed by the building official, administers the process (15-03-050).
Violations & Fines
Covering or concealing work before it is inspected and approved is a code violation, and the building official can require its removal at the owner's expense to permit inspection. A reinspection fee applies under Table 1-A when work called for inspection is not ready or required corrections are not made, though the first rejection on a job does not itself trigger a fee. Failure to post the inspection record card, or deviating from approved plans, can also trigger a reinspection fee.
Frequently Asked Questions
How many inspection stages does Broomfield require for a building permit?
How far ahead must I request a Broomfield building inspection?
Can I cover up work before it's inspected in Broomfield?
Is there a fee if my Broomfield inspection fails the first time?
Sources & Official References
Other rules in Broomfield
Compare Broomfield to another location·View the Colorado building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.