Key Facts

First inspection
Foundation, after excavation and forms
Mid-stage inspections
Slab, framing, sheathing, roofing
Final inspection
Before occupancy is allowed
Pool inspections
11 stages incl. Child Safety Act check
Scheduling duty
Permit holder must request each inspection
Enforcing office
Sanford building official

Summary

In the City of Sanford, Florida, the building official inspects permitted construction in a set sequence, from foundation through framing, sheathing, roofing and final inspection, and it is the permit holder's job to request each inspection and keep the work exposed until it is approved.

110.3. Required inspections. ... The building official, upon notification from the permit holder or his or her agent shall make the following inspections, and such other inspections as deemed necessary and shall either release that portion of the construction or shall notify the permit holder or his or her agent of any violations which must be corrected in order to comply with the technical codes. The building official shall determine the timing and sequencing of when inspections occur and what elements are inspected at each inspection. ... 1.Foundation inspection. To be made after trenches are excavated and forms erected. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place.

Full Breakdown

Sec. 18-2 of the Sanford City Code amends the Florida Building Code's administrative chapter, and Sec. 110.3, Required inspections, directs the building official to make the required inspections upon notification from the permit holder or agent, then either release that portion of construction or notify the holder of violations that must be corrected, with the building official setting the timing and sequence of what is inspected at each stage. For a typical house, that sequence starts with the foundation inspection, made after trenches are excavated and forms erected, including a foundation or form-board survey certifying the building's placement and setback dimensions before construction rises above grade; a slab inspection follows for in-slab reinforcing and utilities before concrete is poured.

Next comes the framing inspection once the roof deck, framing, fireblocking, rough electrical, plumbing, mechanical and gas work are complete, then a sheathing inspection, an insulation and energy inspection, and at least two roofing inspections covering dry-in and final coverings. A final inspection closes out the permit once the building is ready for occupancy, and homes in flood hazard areas must also submit a certified lowest-floor elevation at both the slab and final stages under Sec. 1612.5. Section 110.3 sets out an entirely separate track of eleven pool-specific inspections for swimming pools, from pool foundation and rough plumbing through light-niche and deck bonding, a Child Safety Act inspection verifying pool safety features under Fla.

Stat. § 424.2.17, and a final pool inspection before the pool may be filled or used. Sec. 110.1 makes it the permit applicant's duty to keep the work exposed and accessible until each inspection is approved, and the city is not liable for costs of removing or replacing material installed to hide work before it is inspected.

Violations & Fines

Covering up work before it is inspected, or proceeding to the next construction stage without the building official releasing the prior inspection, forces the contractor to expose the concealed work again at their own expense under Sec. 110.1, since the city bears no liability for removal or replacement costs. A structure occupied or used without passing its required final inspection, or a pool filled with water before its Child Safety Act and final pool inspections are approved, is a Code violation subject to the city's general penalty under Sec. 1-7: up to a $500.00 fine, up to 60 days imprisonment, or both.

Frequently Asked Questions

What inspections does a Sanford home construction project need?
Sec. 110.3 lists foundation, slab, framing, sheathing, roofing (at least two visits) and a final inspection before occupancy, plus insulation, gypsum board and fire-rated assembly checks as they apply, with the building official setting the timing and sequence for each project.
Who has to schedule building inspections in Sanford?
The permit holder or their agent must notify the building official to request each inspection under Sec. 110.3, and Sec. 110.1 makes it the applicant's duty to keep the work accessible and exposed until the building official approves it.
What inspections does a residential pool need before it can be filled?
Sec. 110.3 lists eleven pool-specific stages, including foundation, plumbing rough-in, light-niche and deck bonding, and a Child Safety Act inspection confirming pool safety features under Fla. Stat. § 424.2.17; approval of that inspection is required before the pool may be filled with water.

Sources & Official References

Other rules in Sanford

All Sanford rules

Florida rules heatmap·Compare Sanford to another location·View the Florida building safety overview

Get notified when Building Inspections in Sanford, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.