Simi Valley, CA Building Safety: Building Inspections (2026)
Key Facts
- Access duty
- Permit holder must keep site exposed for inspection
- Foundation inspection
- Before concrete pour, after rebar placed
- Frame inspection
- After framing/rough-in, before drywall
- Final inspection
- After finish grading, before occupancy
- Reinspection fee
- Charged if work not ready or uncorrected
- Inspection request notice
- At least 1 working day in advance
Summary
Simi Valley requires permitted construction to stay exposed for inspection at each stage, from foundation and framing through final approval, and the Building Official can charge a reinspection fee whenever work is not ready or corrections were not made.
Construction, or work for which a permit is required, shall be subject to inspection by the Building Official and the construction or work shall remain accessible and exposed for inspection purposes until approved by the Building Official. ... The Building Official, upon notification, shall make the following inspections: (a)Foundation inspection. To be made after excavations for footings are complete and required reinforcing steel is in place. ... (d)Frame inspection. To be made after the roof, framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing, and heating wires, pipes, and ducts are approved. ... (h)Final inspection. To be made after finish grading and the building is completed and ready for occupancy or use. ... A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 51).
Full Breakdown
01 of the Simi Valley Municipal Code requires that construction or work for which a permit is required remain accessible and exposed for inspection until the Building Official approves it, and it is the permit applicant's duty, not the City's, to keep the site accessible. 06 lists the specific inspections the Building Official performs on request: a foundation inspection made after footing excavation and reinforcing steel placement but before concrete pour; a concrete slab or under-floor inspection made before concrete or subfloor sheathing covers in-slab plumbing, electrical, and other equipment; a frame inspection made after roof framing, fire blocking, and bracing are complete and rough electrical, plumbing, and heating systems are approved; a lath and wallboard inspection made before plaster or taping covers the framing; an energy efficiency inspection checking Title 24 Part 6 compliance for insulation, fenestration, ducts, and HVAC efficiency; and a final inspection made after finish grading, once the building is ready for occupancy.
03 requires the person doing the work to request each inspection, which the Building Official may require be filed at least one working day in advance. 04, work cannot proceed past a completed inspection point, and reinforcing steel or structural framing cannot be covered, until the Building Official signs off; anything that does not comply must be corrected before it can be concealed. 09 lets the City assess a reinspection fee whenever the work is not ready when called for, or when required corrections have not been made, though the first rejection for noncompliance does not itself trigger a fee. Further inspections stop until any assessed reinspection fee is paid.
Violations & Fines
Concealing framing, reinforcing steel, or in-slab equipment before the required inspection is approved violates Section 8-9.04 and can require the work to be uncovered for inspection at the permit holder's expense. Failing to keep the site accessible for inspection under Section 8-9.01(c) or calling for an inspection before the work is ready can trigger a reinspection fee under Section 8-9.09, and further inspections are withheld until that fee is paid.
Frequently Asked Questions
What building inspections does Simi Valley require during construction?
Can I cover framing before the inspector signs off in Simi Valley?
Does Simi Valley charge a fee for a failed inspection?
Sources & Official References
Other rules in Simi Valley
California rules heatmap·Compare Simi Valley to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Inspections in Nearby Cities
How other cities in Ventura County handle building inspections.