Key Facts

Core rule
Separate permit required for each structure/system
Fence exemption
Up to 7 feet high, no permit needed
Retaining wall exemption
Up to 4 feet, no surcharge or hazardous liquid
Water tank exemption
Up to 5,000 gallons on grade
Application expiration
1 year if no permit issued
Permit expiration
12 months if work not started

Summary

Simi Valley requires a separate permit from the Building Official before erecting, altering, moving, or demolishing any building, structure, or building service equipment, but exempts a defined list of small structures like short fences, low retaining walls, and small water tanks.

Except as specified in this Chapter, no building, structure or building service equipment regulated by this Title and the technical codes shall be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a separate, appropriate permit for each building, structure or building service equipment has first been obtained from the Building Official. ... A building permit shall not be required for the following: ... Fences not over seven (7) feet (2,134 mm) high. ... Retaining walls which are not over four (4) feet (1,219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or III-A Liquids. ... Platforms, sidewalks and driveways not more than thirty (30) inches (762 mm) above adjacent grade, and not over any basement or story below, and are not part of an accessible route. ... Unless otherwise exempted by this Title, separate plumbing, electrical and mechanical permits will be required for the above exempted items.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 51).

Full Breakdown

01 of the Simi Valley Municipal Code states the City's core building-permit rule: except as specifically listed in Chapter 5, no building, structure, or building service equipment regulated by Title 8 and the adopted technical codes may be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted, or demolished unless a separate permit for each building, structure, or piece of equipment is obtained from the Building Official first. 03 then lists specific exemptions from a building permit, including fences not over seven feet high, retaining walls not over four feet measured from the bottom of the footing (unless they support a surcharge or hold hazardous liquids), water tanks on grade holding no more than 5,000 gallons with a height-to-diameter ratio no greater than two to one, and platforms, sidewalks, or driveways rising no more than 30 inches above grade that are not over a basement and are not part of an accessible route.

03(b) still requires separate plumbing, electrical, or mechanical permits for exempted work if that work involves those trades. 00. 05 becomes null and void if work does not begin within 12 months or is abandoned for 180 days, after which a new permit and full fees are required.

Violations & Fines

Performing work requiring a permit without first obtaining one from the Building Official violates Section 8-5.01 and can result in a stop-work order and fee penalties under the City's adopted technical codes. Issuance of a permit does not authorize work that otherwise violates Title 8 or another City ordinance under Section 8-7.04, and the Building Official may still require correction of errors discovered after a permit is issued.

Frequently Asked Questions

Do I need a permit to build a fence in Simi Valley?
Only if it exceeds seven feet in height. Section 8-5.03(a)(2) exempts fences not over seven feet from the building permit requirement, though other zoning rules on fence height and materials near the front yard can still apply separately.
How long is a Simi Valley building permit valid before work must start?
Section 8-7.05 voids a permit if the authorized work has not commenced within 12 months of issuance, or if the work is suspended or abandoned for 180 days after starting. A new permit and new fees are required to restart after that.
Is a building permit required for a small retaining wall?
Not if it is four feet or less measured from the bottom of the footing to the top of the wall and does not support a surcharge or retain Class I, II, or III-A liquids, per Section 8-5.03(a)(5). Taller or load-bearing retaining walls need a permit.

Sources & Official References

Other rules in Simi Valley

All Simi Valley rules

California rules heatmap·Compare Simi Valley to another location·View the California building safety overview

Get notified when Building Permits in Simi Valley, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Ventura County handle building permits.

Ventura, CA
Some Restrictions
Moorpark, CA
Some Restrictions
Oxnard, CA
Some Restrictions
Camarillo, CA
Some Restrictions
Thousand Oaks, CA
Heavy Restrictions