Camarillo, CA Building Safety: Building Permits (2026)
Key Facts
- Two approvals needed
- Zone clearance plus building permit (§19.48.010)
- Who issues zone clearance
- Department of planning and community development
- Who issues building permit
- Building department
- Occupancy checkpoint
- Certificate of occupancy required before use (§19.48.020)
- Flood hazard refusal
- Public works director can refuse permit (§19.48.070)
- Appeal path
- Planning commission, then city council (final)
Summary
Before starting almost any construction in Camarillo, from erecting a new building to altering or adding onto an existing one, Municipal Code Section 19.48.010 requires both a zone clearance from planning and community development and a building permit from the building department. Skipping either one makes the work unlawful.
It is unlawful to commence any work pertaining to the erection, construction, reconstruction, moving, conversion or alteration of any building, or any addition to any building, until a zone clearance is secured from the department of planning and community development and a building permit from the building department.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27 Update 1).
Full Breakdown
010 states the baseline rule for when Camarillo requires authorization before construction begins: it is unlawful to commence work on the erection, construction, reconstruction, moving, conversion or alteration of any building, or any addition to a building, until both a zone clearance is secured from the department of planning and community development and a building permit is obtained from the building department. 030 requires the permit application to include the lot's size and location, the size and location of buildings on it, and the dimensions of yards and open spaces, with the department authorized to demand a licensed survey if existing records are not accurate enough.
020 adds a second checkpoint at the back end of the process: no building or land may be occupied or used until a certificate of occupancy, and any required use license, is obtained. 060 backs both requirements with a void-ability clause: no building permit may be issued for a structure or use that does not conform to this chapter or to an approved development plan or conditional use permit, and any permit issued in violation of that rule is void and of no effect. 070 adds a flood-hazard check: the director of public works must refuse a building permit if the lot is located so as to create a flood hazard to the proposed structure or to adjacent structures, though an applicant can appeal that refusal to the planning commission, with the city council having final say.
Violations & Fines
Commencing construction, moving, conversion or alteration of a building without both the required zone clearance and building permit is unlawful under Section 19.48.010. A permit issued in violation of Chapter 19.48, such as one not conforming to an approved development plan or conditional use permit, is void and of no effect under Section 19.48.060, and occupying a building without the certificate of occupancy required by Section 19.48.020 is likewise prohibited.
Frequently Asked Questions
What approvals does Camarillo require before I start building?
Can Camarillo refuse to issue my building permit?
Do I need anything besides a building permit to move into a new Camarillo building?
Sources & Official References
Other rules in Camarillo
California rules heatmap·Compare Camarillo to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.