Camarillo, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Two approvals needed
Zone clearance plus building permit (§19.48.010)
Who issues zone clearance
Department of planning and community development
Who issues building permit
Building department
Occupancy checkpoint
Certificate of occupancy required before use (§19.48.020)
Flood hazard refusal
Public works director can refuse permit (§19.48.070)
Appeal path
Planning commission, then city council (final)

Summary

Before starting almost any construction in Camarillo, from erecting a new building to altering or adding onto an existing one, Municipal Code Section 19.48.010 requires both a zone clearance from planning and community development and a building permit from the building department. Skipping either one makes the work unlawful.

It is unlawful to commence any work pertaining to the erection, construction, reconstruction, moving, conversion or alteration of any building, or any addition to any building, until a zone clearance is secured from the department of planning and community development and a building permit from the building department.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27 Update 1).

Full Breakdown

010 states the baseline rule for when Camarillo requires authorization before construction begins: it is unlawful to commence work on the erection, construction, reconstruction, moving, conversion or alteration of any building, or any addition to a building, until both a zone clearance is secured from the department of planning and community development and a building permit is obtained from the building department. 030 requires the permit application to include the lot's size and location, the size and location of buildings on it, and the dimensions of yards and open spaces, with the department authorized to demand a licensed survey if existing records are not accurate enough.

020 adds a second checkpoint at the back end of the process: no building or land may be occupied or used until a certificate of occupancy, and any required use license, is obtained. 060 backs both requirements with a void-ability clause: no building permit may be issued for a structure or use that does not conform to this chapter or to an approved development plan or conditional use permit, and any permit issued in violation of that rule is void and of no effect. 070 adds a flood-hazard check: the director of public works must refuse a building permit if the lot is located so as to create a flood hazard to the proposed structure or to adjacent structures, though an applicant can appeal that refusal to the planning commission, with the city council having final say.

Violations & Fines

Commencing construction, moving, conversion or alteration of a building without both the required zone clearance and building permit is unlawful under Section 19.48.010. A permit issued in violation of Chapter 19.48, such as one not conforming to an approved development plan or conditional use permit, is void and of no effect under Section 19.48.060, and occupying a building without the certificate of occupancy required by Section 19.48.020 is likewise prohibited.

Frequently Asked Questions

What approvals does Camarillo require before I start building?
Section 19.48.010 requires two separate approvals before any erection, construction, reconstruction, moving, conversion or alteration of a building can start: a zone clearance from the department of planning and community development, confirming the project meets zoning rules, and a building permit from the building department, covering the construction itself.
Can Camarillo refuse to issue my building permit?
Yes. Section 19.48.060 voids any permit that doesn't conform to the chapter or to an approved development plan or conditional use permit, and Section 19.48.070 lets the director of public works refuse a permit outright if the lot is in a flood hazard area. You can appeal a flood-hazard refusal to the planning commission, with the city council's decision final.
Do I need anything besides a building permit to move into a new Camarillo building?
Yes. Section 19.48.020 separately requires a certificate of occupancy, plus any required use license, before a building or the land can be occupied or used. Getting the building permit does not by itself authorize occupancy; the certificate of occupancy is a distinct sign-off issued once construction is complete and compliant.

Sources & Official References

Other rules in Camarillo

All Camarillo rules

California rules heatmap·Compare Camarillo to another location·View the California building safety overview

Get notified when Building Permits in Camarillo, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Ventura County handle building permits.

Ventura, CA
Some Restrictions
Moorpark, CA
Some Restrictions
Simi Valley, CA
Some Restrictions
Oxnard, CA
Some Restrictions
Thousand Oaks, CA
Heavy Restrictions