Vineland, NJ Building Safety: Plumbing Permits (2026)
Key Facts
- Standard fixture fee
- $15 per fixture or stack
- Special device fee
- $75 (boilers, grease traps, etc.)
- Backflow reinspection fee
- $45 per device, annually
- Minimum plumbing permit fee
- $50
- Gas service entrance inspection
- no fee charged
Summary
Plumbing work in the City of Vineland needs a permit under the Uniform Construction Code plumbing subcode, billed per fixture. Standard fixtures cost $15 each, special devices like grease traps and boilers cost $75, and every plumbing permit carries a $50 minimum fee.
The plumbing subcode fees shall be as follows: ... Plumbing fixtures and stacks. The fee shall be in the amount of $15 per fixture or stack for all fixtures except as listed in Subsection A(2)(b) below. ... The fee shall be $75 for the following special devices: grease traps, oil separators, water-cooled air-conditioning units, refrigeration units, utility service connections, utility service disconnections, backflow preventers equipped with test ports (double check-valve assembly, reduced-pressure-zone and pressure-vacuum-break backflow preventers), steam boilers, hot-water boilers (excluding those for domestic water heating), gas piping, active solar systems, sewer pumps, interceptors and fuel oil piping and manufactured home hookups. ... The minimum plumbing subcode fee shall be $50.
Full Breakdown
The City of Vineland's plumbing subcode fees, set out in City Code § 300-3A(2), charge $15 per fixture or stack for ordinary plumbing fixtures, which include lavatories, kitchen sinks, slop sinks, urinals, water closets, bathtubs, shower stalls, laundry tubs, floor drains, drinking fountains, dishwashers, garbage disposals, clothes washers and hot-water heaters. A higher $75 fee applies to specialized devices: grease traps, oil separators, water-cooled air-conditioning units, refrigeration units, utility service connections and disconnections, backflow preventers with test ports, steam and hot-water boilers, gas piping, active solar systems, sewer pumps, interceptors, fuel oil piping and manufactured home hookups, though gas service entrances carry no inspection fee at all.
Cross-connection and backflow-preventer devices that require annual reinspection are billed $45 per device each year, and water-pressure-booster pumps run $75. Every plumbing permit, no matter how small the job, carries a $50 minimum subcode fee. These fees are paid to the Construction Enforcement Agency, under the Department of Licenses and Inspections, before the permit issues, and are just one component of the overall construction permit fee alongside the building, electrical, fire protection and mechanical subcodes under the same section.
Violations & Fines
Performing plumbing work covered by the Uniform Construction Code without first obtaining and paying for the plumbing subcode permit is enforceable under the City's general penalty ordinance, § 1-15, in Vineland Municipal Court: a fine of $100 to $2,000, up to 90 days in the Cumberland County Jail, or up to 90 days of community service.
Frequently Asked Questions
How much does a plumbing permit cost in Vineland?
Do backflow preventers need annual inspection?
Is there a fee for connecting gas service?
Sources & Official References
Other rules in Vineland
Compare Vineland to another location·View the New Jersey building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.