Building Safety in Bossier City, LA (2026)
6 verified building safety rules for Bossier City, Louisiana, sourced directly from the municipal code and official government pages.
Verified from official government sources
Childcare Center Rules
Bossier City's Unified Development Code requires a day care facility in a residential district to abut an arterial or collector street, pass Site Plan Review under Section 3.7, meet state licensing for building, fire, safety and health, and fully enclose outdoor play areas, keeping driveways and drop-off lanes out of the fenced space.
Bossier City Day Care Facility Rules
Some RestrictionsBossier City Unified Development Code, Appendix A § 5.6.5
A.A day care facility may be permitted in certain residential districts shown in the Use Table, provided it abuts and draws access from an Arterial or Collector street. Site Plan Review, as specified in Section 3.7, is required for any day care center located within a residential district for approval or expansion.B.State licensing requirements shall be met, including those pertaining to buildi...
Green Building Code
Bossier City has no mandatory green building code. Within the National Cyber Research Park Overlay District, the Unified Development Code only encourages developers to voluntarily follow LEED, the U.S. Green Building Council's rating system, for energy, stormwater and water-use performance; it does not require certification or compliance anywhere in the city.
Bossier City NCRP Green Building Guidelines
Few RestrictionsBossier City Unified Development Code, Appendix A § 5.7.3.Q.9
9.Leadership in Energy and Environmental Design (LEED). The NCRP would like to encourage the adoption of environmental friendly guidelines based on the Leadership in Energy and Environmental Design, or LEED. These rating systems are designated by the U.S. Green Building Council and have been incorporated in buildings all across the nation. ... The guidelines include performance targets and have...
Building Permits
Bossier City requires a building permit before anyone constructs, enlarges, alters, repairs, moves, or demolishes a building or structure, per section 18-38. Section 18-39 backs that with a flat ban on unpermitted work. The building official reviews plans against the adopted Code before issuing the permit, and starting work first doubles the fee under section 18-40.
Bossier City Building Permit Requirement
Some RestrictionsBossier City Code §§ 18-38(1)(a), 18-39(1)(a)
Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, or construct a sign of any description, or to install or alter fire-extinguishing apparatus, elevators, engines, or to install a steam boiler, furnace, heater, incinerator, or other heat producing apparatus, or other appurt...
Electrical Permits
Bossier City requires a permit from the electrical inspector before any wiring installation, alteration, or addition under section 18-163. Section 18-191 adopts the latest edition of the National Electrical Code by reference as the city's wiring standard. Minor repairs under $100.00 can proceed before the permit but still need one afterward.
Bossier City Electrical Permit and NEC Rule
Some RestrictionsBossier City Code §§ 18-163(a), 18-191
Before proceeding with the installation, alteration of or the addition to any electrical wiring or equipment within or on any building, structure or premises, publicly or privately owned, within the jurisdiction of this article, the master electrician, electrical sign manufacturer or specialty electrician shall first file with the permit department an application on a form furnished by the elec...
Plumbing Permits
Bossier City requires a permit from the plumbing inspector before any plumbing or gas piping work begins, and only a Louisiana-licensed master plumber or master gas fitter registered with the city may pull it. Registration runs $150.00 a year for master plumbers and $30.00 for journeymen. Permit and inspection fees start at $40.00, and starting work before a permit issues doubles the fee and adds a $500.00 penalty.
Bossier City Plumbing and Gas Permits
Some RestrictionsBossier City Code §§ 18-306, 18-311
No plumbing or gas piping work, unless expressly accepted within this Code, shall be started prior to the issuance of a permit by the plumbing inspector. A permit shall be issued only to a registered person with Louisiana master gas fitter license or master plumbing license. ... Any permit requiring inspection, minimum fee . .$40.00 ... (b)Any work begun or completed without first securing a pe...
Building Inspections
Bossier City requires the building inspector to check construction at set stages under section 18-41: a foundation inspection after excavation and forms, a frame inspection once framing and rough-ins are done, and a final inspection before occupancy. No certificate of occupancy issues under section 18-42 until that final inspection clears.
Bossier City Building Inspection Stages
Some RestrictionsBossier City Code § 18-41(2)
The building inspector shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building or structure upon completion, prior to the issuance of the certificate of occupancy, as required in Sections 105 and 109. ... (1)Foundation inspection: To be made after trenches are excavated and forms ...
Looking for Bossier Parish county-wide rules?
County ordinances apply to unincorporated areas and may supplement Bossier City city rules.
Building Safety in Bossier Parish →