Bossier City, LA Building Safety: Electrical Permits (2026)
Key Facts
- Permit required
- Yes, before any wiring work, Sec. 18-163
- Minor-repair exception
- Jobs $100 or less, permit still follows
- Code adopted
- Latest edition of the National Electrical Code
- Minimum inspection fee
- $40.00 per section 18-167
- Registration bond
- $100,000 indemnity bond for master electricians
Summary
Bossier City requires a permit from the electrical inspector before any wiring installation, alteration, or addition under section 18-163. Section 18-191 adopts the latest edition of the National Electrical Code by reference as the city's wiring standard. Minor repairs under $100.00 can proceed before the permit but still need one afterward.
Before proceeding with the installation, alteration of or the addition to any electrical wiring or equipment within or on any building, structure or premises, publicly or privately owned, within the jurisdiction of this article, the master electrician, electrical sign manufacturer or specialty electrician shall first file with the permit department an application on a form furnished by the electrical inspector and secure a permit therefor. ... There is hereby adopted by reference for the purpose of establishing rules, regulations and standards that certain electrical code known as the latest edition of the National Electrical Code, with amendments and modifications expressly stipulated and contained in this division.
Full Breakdown
Section 18-163(a) of the Bossier City Code requires a master electrician, electrical sign manufacturer, or specialty electrician to file an application with the permit department and secure a permit before proceeding with the installation, alteration, or addition of electrical wiring or equipment on any public or private building, structure, or premises. Section 18-163(b) exempts three narrow categories from that permit: replacing lamps or plugging portable equipment into existing receptacles, work on signal or communications equipment by a communications agency, and work performed by a utility on its own generation, transmission, or distribution equipment.
Section 18-163(c) lets an electrician make minor repairs or additions costing $100.00 or less before securing a permit, but a permit and inspection request are still required once that small job is finished. Section 18-191 adopts the latest edition of the National Electrical Code by reference, with the amendments in division 3 of article III controlling where the city has modified it. Section 18-192 backs that up: where the Code sets no specific standard, compliance with the National Electrical Code counts as prima facie proof of safe construction, and equipment bearing an Underwriters' Laboratories label is accepted without further testing by the electrical inspector.
Permit fees run on a minimum $40.00 inspection charge under section 18-167, scaled to service size, from $5.00 for up to 60 amps to $30.00 for anything over 2,000 amps.
Violations & Fines
Doing electrical work without the section 18-163 permit, or outside a licensed master, journeyman, or specialty electrician's registration, exposes the contractor to registration suspension or revocation under section 18-103 and to the general misdemeanor penalty of up to $500.00 or 60 days in jail under section 18-47.
Frequently Asked Questions
Do I need a permit for electrical work in Bossier City?
What electrical code does Bossier City enforce?
Can I do a small electrical repair without a permit first?
Sources & Official References
Other rules in Bossier City
Compare Bossier City to another location·View the Louisiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.