Building Safety in New Britain, CT (2026)

7 verified building safety rules for New Britain, Connecticut, sourced directly from the municipal code and official government pages.

Verified from official government sources

Lead Paint

New Britain's housing code bans lead paint and other hazardous coatings on the interior surfaces of any dwelling, rooming house or child-occupied facility, covering window sills, frames, doors, walls, ceilings and stair-rails. Sec. 13-145 lets the director of health order an owner to strip or cover any chipped, flaking or hazardous paint that inspectors find.

New Britain interior lead paint prohibition

Heavy Restrictions

New Britain Code of Ordinances §§ 13-145, 13-260

(a)Lead paint or potentially hazardous material on the interior surfaces of any dwelling unit, rooming unit, rooming house or on any fixtures or other objects used, installed in or located in or upon any exposed surface in any facility subject to letting or occupancy by children, is prohibited. ... (b)All painted portions of all buildings used or intended to be used in whole or in part for huma...

Fire Sprinkler Requirements

New Britain bars a rooming house from housing a blind or bedridden tenant in a room or bed above the first floor unless the building is built of fire-resistant materials and carries a sprinkler system approved by the fire department. Sec. 13-210 ties the occupancy restriction to that safety upgrade rather than requiring sprinklers citywide.

New Britain rooming house sprinkler occupancy rule

Significant Restrictions

New Britain Code of Ordinances §§ 13-210, 13-260

No room or bed in any rooming house above the first floor shall be occupied by a blind or bedridden person unless such rooming house is constructed of fire resistant materials and is equipped with a sprinkler system approved by the fire department. ... Any person who shall violate any provision of this chapter may be punished by a fine of not more than one hundred fifty dollars ($150.00).

Childcare Center Rules

In the City of New Britain, a child daycare use zoned under Section 270-40-40.260 of the Zoning Ordinance needs at least 6,000 square feet of lot area, 250 square feet of lot area per child, and 100 square feet of outdoor play space per child, or an approved play schedule from the Zoning Board of Appeals. The rule dates to March 16, 2023.

New Britain Child Daycare Lot Size Rules

Some Restrictions

New Britain Zoning Ordinance § 270-40-40.260.10, 270-40-40.260.20, 270-40-40.260.30

There shall be a minimum lot area of six thousand (6,000) square feet. ... There shall be, at a minimum, two hundred fifty (250) square feet of lot area per child. ... There shall be provided a minimum of one hundred (100) square feet of open play space on the lot for each child, or the applicant shall obtain approval from the Zoning Board of Appeals of a play schedule, which shall identify the...

Door Locking Hardware

New Britain's housing code requires every exterior door of a rented dwelling to carry a positive locking device that engages automatically once the door closes. If the lock uses a throw bolt, the bolt must extend at least five-eighths of an inch when locked, and inspectors reject any lock built with a beveled latch.

New Britain rental exterior door lock rule

Some Restrictions

New Britain Code of Ordinances §§ 13-103, 13-260

No person shall let to another for occupancy any dwelling or dwelling unit unless every exterior door is equipped with a safe, functioning locking device requiring engagement after closing the door, and if such locking device contains a throw bolt, then such throw bolt, when in locked position, shall have a throw of not less than five-eighths of an inch, provided that no such positive locking d...

Building Permits

New Britain will not issue a permit for new construction, alteration, removal, demolition or any other building operation under section 7-1 until the required fee is paid to the building official, with charges starting at thirty-five dollars per thousand dollars of project value and rising by tier as the estimated cost increases.

New Britain Building Permit Fees and Requirements

Some Restrictions

New Britain Code of Ordinances § 7-1

No permit to begin work for new construction alteration, removal, demolition or other building operation shall be issued until the fees prescribed in this chapter shall have been paid to the building official (or other authorized municipal agency), nor shall an amendment to a permit necessitating an additional fee because of an increase in the estimated cost of the work involved be approved unt...

Electrical Permits

New Britain requires a separate electrical permit under section 7-2, apart from the building permit fee, and section 7-13 fines anyone fifty dollars for starting electrical, plumbing, heating or sprinkler work before applying for and receiving that permit, on top of the permit fee itself.

New Britain Electrical Permit Fee and Fine Rules

Some Restrictions

New Britain Code of Ordinances §§ 7-2, 7-13

The payment of the fee for the new construction, additions, alteration, removal or demolition and for all work done in connection with or concurrently with the work contemplated by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees that may be prescribed by law or ordinance for zoning permits and certificates, water taps, sewer connections, ...

Building Inspections

New Britain ties the last stages of a construction project to inspection under sections 7-1, 7-10 and 7-12: a fifty dollar fee applies every time a trade inspector is called back for a final reinspection on jobs over five thousand dollars, and the certificate of occupancy cannot issue until costs are verified and, where applicable, public works confirms sidewalk repairs.

New Britain Final Reinspection and CO Sign-Off Steps

Some Restrictions

New Britain Code of Ordinances §§ 7-1, 7-10, 7-12

The fees for final reinspection for construction over five thousand dollars ($5,000.00) shall be fifty dollars ($50.00) for each trade inspector called for reinspection. This fee shall apply each time an inspector is called for a final reinspection. ... When the job is completed, the chief building official may request proof of the total construction cost done under all approved permits, and th...