Environmental Rules in Pismo Beach, CA (2026)
4 verified environmental rules for Pismo Beach, California, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
In the City of Pismo Beach, California, Chapter 13.28 bars anything but storm water from the storm drain system, requires a city permit to connect to a public storm drain, and gives the Public Works Director power to order remediation, stop work and abatement. Violations are misdemeanors under Chapter 1.20 with added administrative fines.
Pismo Beach Stormwater Quality Ordinance Rules
Some RestrictionsPismo Beach Municipal Code §§ 13.28.020, 13.28.090, 13.28.180
The purpose and intent of this chapter is to ensure the health, safety, and general welfare of citizens, and protect and enhance the quality of watercourses and water bodies in a manner pursuant to and consistent with the Clean Water Act by reducing pollutants in storm water discharges to the maximum extent practicable, by prohibiting non-storm water discharges to the storm drain system, and im...
Erosion Control
In the City of Pismo Beach, California, a project with a grading permit or any other permit likely to create a pollution source must submit an erosion control plan. On a construction site with inadequate erosion and sediment controls, the director gives verbal notice and issues a notice of violation, and the city allows no other site work until the controls are in place.
Pismo Beach Construction Erosion and Sediment Control
Some RestrictionsPismo Beach Municipal Code §§ 13.28.150, 13.28.260, 15.08.010
E. Compliance. ... A person with a project that includes a grading permit or any other permit that is likely to create a source of pollution shall submit an erosion control plan. ... ... B. Construction sites. The director shall give verbal notice and issue a notice of violation to persons owning or controlling construction sites with inadequate erosion and sediment controls that such controls ...
Flood Zones
In the City of Pismo Beach, California, Chapter 15.44 requires a development permit before any construction or other development in an area of special flood hazard, administered by the community development director with the city engineer, and makes a violation a misdemeanor under § 15.44.080.
Flood Hazard Area Development Permits in Pismo Beach, California
Some RestrictionsPismo Beach Municipal Code §§ 15.44.080, 15.44.130, 15.44.150
No structure or land shall hereafter be constructed, located, extended, converted, or altered without full compliance with the terms of this chapter and other applicable regulations. Violation of the requirements of this chapter, including violations of conditions and safeguards, shall constitute a misdemeanor. ... The community development director in cooperation with the city engineer is here...
Flood Elevation Requirements
In the City of Pismo Beach, California, Municipal Code § 15.44.170(C) requires the lowest floor of new or substantially improved residential structures in AE, AH and A flood zones to be at or above the base flood elevation, with a separate rule for AO zones and an engineer or surveyor certificate at completion.
Flood Elevation Requirements in Pismo Beach, California
Some RestrictionsPismo Beach Municipal Code § 15.44.170
C. Elevation and Floodproofing. 1. Residential construction. All new construction or substantial improvements of residential structures shall have the lowest floor, including basement: a. In AE, AH, and A zones, elevated to or above the base flood elevation. b. In an AO zone, elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FI...