Environmental Rules in Southampton Village, NY (2026)
5 verified environmental rules for Southampton Village, New York, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
In the Village of Southampton, every land development activity covered by Chapter 93 must submit a stormwater pollution prevention plan (SWPPP) to the Stormwater Management Officer, who is the Village Building Inspector. No land development activity can be undertaken until that plan is approved. Exemptions cover items such as home gardening and the installation of fence posts.
Southampton Village Stormwater Management and SWPPP Rules
Some RestrictionsSouthampton Village Code § 93-3
A. This chapter shall be applicable to all land development activities as defined in § 93-2 of this chapter. B. The Village Building Inspector is hereby designated as the Stormwater Management Officer under this chapter. C. All land development activities shall be required to submit a stormwater pollution prevention plan (SWPPP) to the Stormwater Management Officer for review and approval by th...
Erosion Control
In the Village of Southampton, construction sites must keep erosion and sediment controls running under an approved SWPPP. Sediment is removed from traps and ponds when design capacity drops by 50%, and larger projects need a qualified inspector to check the controls every seven days, with reports kept in a site logbook.
Southampton Village Construction Erosion and Sediment Control
Some RestrictionsSouthampton Village Code § 93-7A
A. Maintenance and inspection during construction. (1) The applicant or developer of the land development activity or his or her representative shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the applicant or developer to achieve compliance with the conditions of this chapter. Sedimen...
Flood Zones
In the Village of Southampton, no development can start in an area of special flood hazard without a floodplain development permit from the Building Inspector, who is the designated local administrator. The permit carries an application fee set by Board of Trustees resolution plus a review deposit of no more than $500, and occupancy of a new or altered building requires a certificate of compliance.
Flood Zone Development Permits in Southampton Village, NY
Some RestrictionsSouthampton Village Code § 62-12
A. Purpose. A floodplain development permit is hereby established for all construction and other development to be undertaken in areas of special flood hazard in this community for the purpose of protecting its citizens from increased flood hazards and insuring that new development is constructed in a manner that minimizes its exposure to flooding. It shall be unlawful to undertake any developm...
Boat Dock Permits
In the Village of Southampton, no one can build, rebuild, enlarge or alter a dock, bulkhead, boathouse or similar structure in, on, under or within 150 feet of a wetland, watercourse or tidal water without a wetlands special permit from the Zoning Board of Appeals. The application fee is $750 or the amount the Board of Trustees sets by resolution.
Southampton Village Dock and Wetlands Special Permit
Significant RestrictionsSouthampton Village Code § 116-19.2
Without first having a obtained a wetlands (natural resource) special permit from the Village Zoning Board of Appeals and complying with Chapters 49, 54, 97 and 116 of the Village Code, no person shall commence a regulated activity within a wetland or a regulated area or: ... C. Erect, construct, reconstruct, enlarge or alter any structure, including but not limited to any groin, bulkhead, dock...
Flood Elevation Requirements
New and substantially improved homes in the Village of Southampton's A1-A30, AE and AH flood zones must have the top of the lowest floor, basement included, at least two feet above base flood elevation. In Zone AO the floor must sit above the highest adjacent grade by the mapped depth number plus one foot of freeboard, and in unmapped Zone A the applicant establishes the elevation and adds two feet.
Base Flood Elevation and Freeboard in Southampton Village
Some RestrictionsSouthampton Village Code § 62-17
A. Elevation. ... The following standards, apply to new and substantially improved residential structures located in areas of special flood hazard, ... (1) Within Zones A1-A30, AE, AH, if base flood elevation data are available, new construction and substantial improvements shall have the top of the lowest floor (including basement) elevated to or above two feet above the base flood elevation. ...
Looking for Suffolk County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Southampton Village city rules.
Environmental Rules in Suffolk County →