Fire Sprinkler Requirements

Butte County requires automatic fire sprinklers in every Limited Density Owner-Built Rural Dwelling larger than 1,200 square feet, a distinct permit track for owner-built homes on rural parcels reviewed by Cal Fire Butte County. Manufactured homes are exempt. Sprinklers must comply with NFPA 13D or the current adopted California Residential Code, and every such dwelling must also meet Chapter 7A exterior wildfire-exposure material standards.

Butte County Fire Sprinklers for Rural Homes

Some Restrictions

Butte County Code of Ordinances § 26-89

A Limited Density Owner-Built Rural Dwelling permit application shall be reviewed by Cal Fire Butte County for compliance with Public Resources Code sections 4290 and 4291, and Butte County Code. All Limited Density Owner-Built Rural Dwellings shall comply with the "Materials and Construction Methods for Exterior Wildfire Exposure" requirements found in the current adopted California Residentia...

Carbon Monoxide Detectors

Under Butte County Code Section 26-94, dwellings built through the county's Limited Density Owner-Built Rural Dwelling program must have carbon monoxide alarms installed to the current California Residential Code wherever electrical wiring is present. If the owner chooses not to wire the structure for electricity at all, the code still requires an alarm, but allows it to run on batteries as long as those batteries are rated for ten years.

Butte County Carbon Monoxide Alarm Rule

Some Restrictions

Butte County Code of Ordinances § 26-94

Where electrical wiring or appliances are installed, the installation shall be in accordance with the applicable requirements contained in the most recently adopted version of the California Electrical Code, Part 3, Title 24, California Code of Regulations. Smoke and carbon monoxide alarms shall be installed per the most current adopted California Residential Code. If electrical wiring is not b...

Electrical Permits

Butte County adopts Part 3 of Title 24, the California Electrical Code, by reference as its electrical code under Section 26-1. Electrical permits run on the same one-year expiration and renewal clock as building permits under Section 26-3.1(c), and the Building Official amended the code to exempt agricultural water pumps used solely for agricultural purposes from needing an electrical permit at all.

Butte County Electrical Permit Rules

Some Restrictions

Butte County Code of Ordinances § 26-1 (Adoption of California Electrical Code); § 26-3.1(a) (Work Exempt From Permit - Electrical)

Part 3 California Electrical Code. ... The 2025 California Building Standards Code parts and appendices listed above are hereby declared to be the building code for Butte County and shall apply to and govern all building construction in the unincorporated areas of the county... "Electrical", "4" is added as follows: No permits shall be required for the installation, alteration or repair of agri...

Plumbing Permits

Butte County adopts Part 5 of Title 24, the California Plumbing Code, by reference as its plumbing code under Section 26-1. Plumbing permits follow the same administrative timeline as building permits under Section 26-3.1(c): a one-year window to start work after filing, a one-year permit life once issued, and a 30-day grace period to renew before a new application and fees are required.

Butte County Plumbing Permit Rules

Some Restrictions

Butte County Code of Ordinances § 26-1 (Adoption of California Plumbing Code); § 26-3.1(c) (Permits Under the California Plumbing Code)

Part 5 California Plumbing Code ... The 2025 California Building Standards Code parts and appendices listed above are hereby declared to be the building code for Butte County and shall apply to and govern all building construction in the unincorporated areas of the county... The following provision shall apply to permits under the 2025 California Residential Code, 2025 California Electrical Cod...

Building Inspections

Butte County requires a Building Official inspection before most new buildings can be occupied. Section 26-3.1(a) amends the California Building Code's Section 111.1 to bar occupancy or a change of use until a certificate of occupancy issues, and amends Section 111.2 to spell out the twelve items that certificate must contain. Single-family homes and most accessory structures are exempted from the certificate requirement.

Butte County Certificate of Occupancy Rules

Some Restrictions

Butte County Code of Ordinances § 26-3.1(a) (Amending California Building Code § 111.1, § 111.2)

Section 111.2 "Certificate issued" is amended to read as follows: Except for Group R, Division 3, and Group U Occupancies, after the building official inspects the building or structure and does not find violations of the provisions of this code or other laws that are enforced by the County, the building official shall issue a certificate of occupancy that contains the following: 1. The buildin...

Building Safety by City in Butte County

1 cities in Butte County have their own building safety rules. Each link goes to that city's dedicated page with code citations.

All Butte County ordinances

See every category we cover for Butte County: parking, noise, fences, fires, animals, pools, and more.

Butte County Ordinance Hub →