Goodyear, AZ Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)
Key Facts
- Permitted as principal use
- Industrial Districts only
- Accessory-use exemption cap
- 10% of gross floor area
- Residential/noise-sensitive setback
- 300 feet
- Pre-permit documentation
- Electric + water usage plans
- Reviewed under
- Section 6.3 site plan process
Summary
Goodyear allows data centers as a principal use only in Industrial Districts, subject to site plan review, utility and water documentation, and a 300-foot setback from residential zoning or noise-sensitive uses for the building and its support equipment.
3.11.16. Data Centers A. Applicability. 1. Principal Use. Data centers are permitted to operate as a principal use in Industrial Districts subject to the requirements of this section. 2. Accessory Use. A Data Center that meets all of the criteria below may be considered an accessory use and is not subject to the requirements of this Section. a. The Data Center exclusively serves the enterprise functions of the on-site property owner or tenant. b. The Data Center does not lease data storage or processing services to third parties. c. The Data Center occupies no more than 10% of the total gross floor area of all buildings on the site. ... C. Development Standards 1. Setbacks. ... a. A minimum setback of three hundred (300) feet shall be provided from any property that is zoned for residential use or from any property containing an existing residential dwelling unit or other existing noise-sensitive use, as determined by the Zoning Administrator, or his or her designee.
Full Breakdown
16(A)(1) permits data centers to operate as a principal use in Industrial Districts, subject to the full requirements of the section. A narrower carve-out in (A)(2) lets a Data Center be treated as an accessory use, exempt from the section, if it exclusively serves the enterprise functions of the on-site property owner or tenant, does not lease data storage or processing services to third parties, and occupies no more than 10% of the total gross floor area of all buildings on the site. 16(B) requires a narrative explaining compliance with each requirement, an operational plan demonstrating zoning, building and fire safety compliance, Electric Service Documentation from the intended utility provider affirming sufficient power exists (which can be waived or amended by the Zoning Administrator for multi-phased projects), and Water Usage Documentation identifying the intended water source and an estimate of annual water consumption.
Development Standards in (C)(1)(a) require a minimum 300-foot setback for the data center building itself, plus its cooling, ventilating, power generator, backup generator, and other power supply equipment, from any property zoned for residential use or containing an existing residential dwelling unit or other existing noise-sensitive use, as determined by the Zoning Administrator. 23, and landscaping replacement duties tied to powerline work serving the facility.
Violations & Fines
A data center that cannot produce the required Electric Service and Water Usage Documentation, or the narrative and operational plan Section 3.11.16(B) requires, does not get its site plan or building permit approved. The Zoning Administrator can waive or amend the electric documentation for multi-phased projects, but the 300-foot residential/noise-sensitive setback in (C)(1)(a) is not listed among the standards subject to that discretion.
Frequently Asked Questions
Where can a data center legally locate in Goodyear?
How far must a data center building sit from homes?
What paperwork does a data center need before a permit?
Does every on-site server room count as a regulated data center?
Sources & Official References
Other rules in Goodyear
Compare Goodyear to another location·View the Arizona data centers & crypto mining overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Data Center Zoning & Siting in Nearby Cities
How other cities in Maricopa County handle data center zoning & siting.