Key Facts
- Residential buffer trigger
- 200 feet requires special use permit
- Size cap, C-3/C-4
- 40,000 sf by right
- Size cap, I-MU/OR
- 80,000 sf by right
- Equipment rule
- Cooling/power gear must be enclosed
- Approving body
- Metropolitan Planning Commission
Summary
Shreveport's UDC treats data centers as a zoning use limited by size and distance to housing. Section 6.1.L requires a special use permit for any data center within 200 feet of a residential district, caps size at 40,000 square feet in the C-3 and C-4 commercial districts and 80,000 square feet in the I-MU and OR districts, and requires all cooling and power equipment to be fully enclosed.
L.Data Center1.All data centers shall only operate in allowable zoning districts as indicated on the Use Matrix in Article 5 of this Code. Any data center located within 200 feet of a residentially zoned district shall require a special use permit approved by the Metropolitan Planning Commission.2.In all allowable zoning districts, all equipment necessary for cooling, ventilating, or otherwise operating the facility must be contained within an enclosed building where the use is located... 3.In the C-3 and C-4 Districts, the maximum permitted size is 40,000 square feet in gross floor area. However, this size limit may be exceeded as part of special use permit approval.4.In the I-MU and OR District, the maximum permitted size is 80,000 square feet in gross floor area. However, this size limit may be exceeded as part of a special use permit approval.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 85 Update 1 | Unified Development Code: Supplement 20).
Full Breakdown
Data centers get their own operating standard in UDC Section 6.1.L, on top of the district-by-district permission in the Table 5-1 Use Matrix, where a 'P/S' designation means the outcome depends on the facility's size and its distance to housing. Any data center within 200 feet of a residentially zoned district needs a special use permit approved by the Metropolitan Planning Commission, regardless of how large it is.
Size caps apply in two zoning categories. In the C-3 and C-4 commercial districts, a data center is capped at 40,000 square feet of gross floor area as a permitted use; a facility that wants to exceed that size can only do so through special use permit approval from the MPC. In the I-MU Industrial Mixed-Use and OR Office Research districts, the cap doubles to 80,000 square feet, again with special use approval available for anything larger.
Every data center, in every allowable district, must contain all equipment used for cooling, ventilating, or otherwise operating the facility, including emergency generators and backup power supply equipment, inside an enclosed building; outdoor cooling towers or generator yards are not permitted regardless of district or size. Data Center is defined in Section 5.3 as a facility used primarily for storing, managing, processing and transmitting digital data, including the servers, power generation, water cooling, and utility infrastructure needed to keep it running.
Violations & Fines
Building or expanding a data center past its 40,000 or 80,000-square-foot cap, placing one within 200 feet of housing, or running cooling or generator equipment outdoors without MPC special use approval violates UDC Section 6.1.L, enforced by the Zoning Administrator under Article 19 with a Code of Ordinances Section 1-14 fine of up to $1,000.00 or 60 days imprisonment per day of violation.
Frequently Asked Questions
How close can a data center be to a house in Shreveport?
How big can a data center be without a special permit?
Can a data center run its generators or cooling outdoors?
Sources & Official References
Other rules in Shreveport
Compare Shreveport to another location·View the Louisiana data centers & crypto mining overview