Southampton, NY Environmental Rules: Boat Dock Permits (2026)
Key Facts
- Permitting body
- Board of Trustees, Freeholders and Commonalty
- Permit term
- One year, renewable up to 4 times
- Unpermitted construction penalty
- Fees doubled under § A340-47.F(1)(c)
- Public hearing notice
- Sign posted, certified mail 10 days ahead
- Hearing timing
- No sooner than 15 days after complete application
- Lumber rule
- Untreated lumber only, banned since June 3, 2002
Summary
In the Town of Southampton outside the villages, no one may erect, alter, enlarge, or demolish a dock, bulkhead, pile, or similar shoreline structure in Town waters without a permit from the Board of Trustees of the Freeholders and Commonalty. Permits run one year, require surveys and plans, and carry a nonrefundable inspection fee before the Trustees will issue them.
§ 47. Permits required; application procedure; issuance; inspections. A. No person shall engage in any of the following activities in Town waters or the bottoms of the Town waters or the bay beach area or ocean beach area as defined herein unless authorized by a permit issued by the Board of Trustees of the Freeholders and Commonalty of the Town of Southampton: ... (3) Erect, construct, reconstruct, alter, enlarge, drive, place, remove, demolish, or deconstruct any structure, including a dock, pile, tie-off poles, moorings, or other obstruction, or bulkhead, jetty, retaining wall, groin, revetment, rip-rap, ramp, catwalk, walkway, stairs, sand fencing or any structure constructed for the purpose of providing access to and from the shoreline ... ... B. Permits will be issued in duplicate, under the seal of this Board, and are good for a period of one year; said permit shall be made out to the owner of the property involved. The original shall be filed with the Clerk of the Board, and a copy shall be kept in the possession of the person in charge of the work at the site thereof, and such permit shall be displayed upon demand.
Full Breakdown
Town Code Chapter A340, Article VII (Dredging, Docks, Bulkheading and Channels) puts every dock, pile, tie-off pole, bulkhead, jetty, ramp, catwalk, or walkway built for shoreline access under the Board of Trustees' permit power under § A340-47. Applicants submit a surveyor's property survey no more than a year old, scaled drawings, site photographs, any recorded covenants, and, where applicable, a Building Department electrical permit; the Board charges a nonrefundable inspection/application fee plus per-structure fees for docks, ramps, catwalks and tie-off poles. Approved permits are issued in duplicate under the Board's seal, run for one year made out to the property owner, and may be renewed for up to four additional one-year terms if the renewal is filed within three months of expiration and the work described has not changed.
The Trustees may require a public hearing on any application that draws significant public interest: the applicant posts a two-by-one-foot sign on-site and mails certified notice to abutting owners at least ten days ahead, the hearing itself cannot open sooner than 15 days after the application is deemed complete, and the Board must close it within 60 days and decide within 45 days of closing. An application sits abandoned, and lapses, if the applicant goes a full year without responding to the Trustees. Only untreated lumber free of chemical preservatives may go into a Trustee-approved dock or bulkhead, a ban in effect since June 3, 2002, and the Trustees reserve the right to inspect any permitted structure and to cancel a permit whenever they find continuing it against the public interest.
Violations & Fines
Building, altering or demolishing a dock or bulkhead in Town waters without first getting Trustees' approval violates § A340-47.A. Any construction activity begun before a permit issues doubles every fee otherwise owed for the application and permit under § A340-47.F(1)(c). The Board of Trustees also reserves the right to cancel an issued permit outright whenever it finds continuing the work is not in the public interest, and every permit stays subject to Trustee inspection for compliance with the application and permit terms.
Frequently Asked Questions
Do I need a permit to build a dock in the Town of Southampton?
How long does a Southampton dock permit last?
What happens if I build a dock before the permit is approved?
Can my neighbors weigh in on my dock permit application?
Can I use pressure-treated lumber for a Trustee-approved dock?
Sources & Official References
Other rules in Southampton
New York rules heatmap·Compare Southampton to another location·View the New York environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Boat Dock Permits in Nearby Cities
How other cities in Suffolk County handle boat dock permits.