Glynn County, GA Environmental Rules: Erosion Control (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit authority
Glynn County Engineer
Application fee
$50.00 per submittal
State water buffer
25 feet, undisturbed vegetation
Civil penalty
Up to $2,500/day
Plan review agency
Satilla River Soil & Water District

Summary

Before disturbing land in unincorporated Glynn County, most projects need a land-disturbing permit from the County Engineer, a $50.00 review fee, and a plan meeting state best-management-practice standards, including a 25-foot vegetated buffer along state waters. Violations bring stop-work orders and civil penalties up to $2,500.00 per day.

These county ordinances apply to unincorporated areas of Glynn County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(15)Except as provided in paragraph (16) of this subsection, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action ... a.No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. ... 1.No person shall conduct any land-disturbing activity within the jurisdictional boundaries of Glynn County without first obtaining a permit from the County Engineer or designee to perform such activity and providing a copy of the Notice of Intent submitted to EPD if applicable. ... a local permitting application and review fee in the amount of $50.00 shall be due and payable to the Local Issuing Authority at the time of each Application and Plan submittal. ... Any person who violates any provision of this ordinance, or any permit condition or limitation established pursuant to this ordinance ... shall be liable for a civil penalty not to exceed $2,500.00 per day.

Full Breakdown

The Soil Erosion, Sedimentation and Pollution Control Ordinance in Chapter 2-5, Article VII, makes Glynn County the 'Local Issuing Authority' for land-disturbing activity under Section 2-5-101(25). Section 2-5-104(B)(1) requires a permit from the County Engineer, or a designee, before any land-disturbing activity, along with a copy of the Notice of Intent filed with EPD if the project needs state general permit coverage; on St. Simons Island or Sea Island, no permit issues until the Islands Planning Commission has approved a site plan or preliminary plat.

00 per disturbed acre, split evenly between the county and the state Environmental Protection Division. Section 2-5-102 exempts activities such as home gardens, single-family construction disturbing under an acre outside a larger development, and projects under one acre outside a 200-foot buffer of state waters. Section 2-5-103(C)(15) establishes a 25-foot buffer along the banks of state waters, measured from where normal stream flow or wave action has wrested away vegetation, and Section 2-5-103(C)(16) sets a matching 25-foot buffer along coastal marshlands; both stay in their natural, undisturbed vegetative state until the site achieves final stabilization, with narrow exceptions for utility line crossings and Director-approved variances.

The District, the Satilla River Soil and Water Conservation District, reviews and approves plans within 35 days, and the County Engineer inspects active sites under Section 2-5-105 to confirm compliance with the approved plan.

Violations & Fines

Section 2-5-106 layers several penalties. Starting land-disturbing work without a permit can cost the violator their business license or occupational tax certificate. A first or second violation draws a written warning with five business days to fix it before a stop-work order issues; a third violation, an imminent health threat, or unpermitted work triggers an immediate stop-work order. Section 2-5-106(D) sets a civil penalty of up to $2,500.00 for each day a violation continues, and the county can also forfeit any performance bond posted under Section 2-5-104(B)(7).

Frequently Asked Questions

Do I need an erosion control permit to build a house on my own lot?
Not always. Section 2-5-102(4) exempts a single-family residence you build yourself when it disturbs less than one acre and isn't part of a larger development of an acre or more, though you still must meet the minimum buffer and control standards in Section 2-5-103.
How wide is the required buffer along streams and marshes?
Section 2-5-103(C)(15) and (16) set a 25-foot buffer along state waters and coastal marshlands, measured from where normal flow or wave action has cleared vegetation. The buffer must stay in its natural, undisturbed vegetative state until the site reaches final stabilization.
What happens if I disturb land without a permit?
Section 2-5-106 authorizes an immediate stop-work order for unpermitted work, revocation of your business license or occupational tax certificate, and a civil penalty of up to $2,500.00 for each day the violation continues, on top of losing any performance bond you posted.

Sources & Official References

Other rules in Glynn County

All Glynn County rules

Compare Glynn County to another location·View the Georgia environmental rules overview

Get notified when Erosion Control in Glynn County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.